RealTrains07
Established Member
- Joined
- 28 Feb 2019
- Messages
- 1,759
In recent news. A post on Facebook has said that with the reduced timetable being bought in from monday, reducing services between manchester airport and scotland. TPE will no longer require the 350/4s to run the electric scotland services
will this mean that the remaining few will finally join their sister units on LNR?
will this mean that the remaining few will finally join their sister units on LNR?