Peter Mugridge
Veteran Member
Would they even be able to operate at a higher frequency? They already often have to pause approaching Bank in the peaks don't they?
Any increase in capacity would probably have to come from introducing a fully "walk through" design of train - which I think is what is planned anyway with the New Tube For London project?
Any increase in capacity would probably have to come from introducing a fully "walk through" design of train - which I think is what is planned anyway with the New Tube For London project?