One of the main capacity issues at Leeds City is the narrow twin line east of the station through to Quarry Hill, which restricts the amount of traffic that can use it. With 4 TPE trains per hour, plus multiple Northern and AXC workings, it is basically at capacity for most of the day.
However, having taken a look at it via multimap, surely it could be expanded. 4 tracks is obviously impossible, but i would think there's certainly room for 3 all the way through. It would then be possible to run an up & down slow with a bi-directional fast.
This would then encourage NXEC to run northbound services (probably to Glasgow Central) from leeds, as well as making services to london via Hambleton much more likely.
However, having taken a look at it via multimap, surely it could be expanded. 4 tracks is obviously impossible, but i would think there's certainly room for 3 all the way through. It would then be possible to run an up & down slow with a bi-directional fast.
This would then encourage NXEC to run northbound services (probably to Glasgow Central) from leeds, as well as making services to london via Hambleton much more likely.