..... and the BBC has it too

http://www.bbc.co.uk/news/uk-wales-north-east-wales-17437506

Two questions:

1) It says 7 miles. Is that the full distance from Wrexham to Saltney Junction ?
2) I thought there would be problems in redoubling part of it as the adjacent dual carriageway had used part of the old carriageway. Is that true ? If so how has it been resolved or is that section still to remain single track ?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,551
Location
Mold, Clwyd
9 miles 42 chains.
According to Planner on the other thread, it looks like Saltney Jn will be doubled and 7 miles of double track from there gets you to the foot of Gresford bank south of Rossett.
Looks like it will be single from there as now over the last 2.5 miles to Wrexham, over the narrow A483 bridge at Gresford.
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
9 miles 42 chains.
According to Planner on the other thread, it looks like Saltney Jn will be doubled and 7 miles of double track from there gets you to the foot of Gresford bank south of Rossett.
Looks like it will be single from there as now over the last 2.5 miles to Wrexham, over the narrow A483 bridge at Gresford.

Thats correct, there was doubt about the width of the underbridge,(Cheshire East & Chester), but it seems OK, so the Dynamic loop is not required.Planner will tell us.

Has I said on the other thread, the single track was installed to save only £450K on the overbridge(Wrexham), due to volume of traffic,cost etc, I never see this bridge being replaced, too much infrastructure required, when the Expressway is shut due to accidents, it backs up for miles both ways in only a few minutes with only one way off at Rossett onto a B Road.

Seems the start date is next year or 2014 according to those in the know.

Happy Days.
 

The Informer

Member
Joined
2 May 2011
Messages
344
Location
Roy's Rolls Cafe
9 miles 42 chains.
According to Planner on the other thread, it looks like Saltney Jn will be doubled and 7 miles of double track from there gets you to the foot of Gresford bank south of Rossett.
Looks like it will be single from there as now over the last 2.5 miles to Wrexham, over the narrow A483 bridge at Gresford.

It actually gets you to the 205mp which is about a 3rd up the bank.Not far from Gresford old station. That's if it is 7 miles exactly.


 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,551
Location
Mold, Clwyd
There's no WG press release nor Network Rail.

All part of the smoke and mirrors.
I'll believe it when it appears in NR's CP5 plans as "committed"!
Modern Railways also talks about signalling work on Anglesey (Ty Croes) needed for the project.

Even the much vaunted electrification projects are still "subject to value for money".

By the way, where are ATW getting the 158 stock for the longer trains from May?
Units back from refurbishment, or better fleet management?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
15,835
It will go ahead, purely because the WAG are chucking the cash at it. Ty Croes needs IBs if I recall correctly to split the section as it is planned as AB from Menai Bridge to Holyhead.
 

PhilipW

Member
Joined
6 Feb 2008
Messages
756
Location
Fareham, Hants
Actually, contrary to what has been written in this thread, this month's 'Modern Railways (April, page 10) reports that the doubling will be in two sections, from Saltney Junction to Rossett and from Gresford to Wrexham North junction leaving a single track section of 2.5 miles in the centre from Rossett to Gresford. This section remains single because of a narrow bridge deck over a road, the curvature of the track and an unstable embankment.

I don't personally don't know this area to comment.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Actually, contrary to what has been written in this thread, this month's 'Modern Railways (April, page 10) reports that the doubling will be in two sections, from Saltney Junction to Rossett and from Gresford to Wrexham North junction leaving a single track section of 2.5 miles in the centre from Rossett to Gresford. This section remains single because of a narrow bridge deck over a road, the curvature of the track and an unstable embankment.

I don't personally don't know this area to comment.

The Modern Railways article is a piece on a consultants report to Welsh Government on improving North to South Wales rail links. The press articles "confirming" the redoubling south of Chester have come from Wrexham CBC not WG or NR as I stated previous.
 

PhilipW

Member
Joined
6 Feb 2008
Messages
756
Location
Fareham, Hants
The Modern Railways article is a piece on a consultants report to Welsh Government on improving North to South Wales rail links. The press articles "confirming" the redoubling south of Chester have come from Wrexham CBC not WG or NR as I stated previous.

Fine, but which part of the line is actually going to be doubled.
-- The north and south part (as per the ' Modern Railways' article'
-- or -- the north and central parts (as per earlier contributors to this thread).
 

a good off

Member
Joined
2 Jul 2010
Messages
326
Location
Control Room
It will go ahead, purely because the WAG are chucking the cash at it. Ty Croes needs IBs if I recall correctly to split the section as it is planned as AB from Menai Bridge to Holyhead.

Ty Croes was some years ago downgraded to a gatebox so will never get IBs. It would however make lots of sense to reinstate it as a block post.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Fine, but which part of the line is actually going to be doubled.
-- The north and south part (as per the ' Modern Railways' article'
-- or -- the north and central parts (as per earlier contributors to this thread).

It would seem none at all at the moment as the funders - WG and NR have not confirmed it going ahead at all.
 

The Informer

Member
Joined
2 May 2011
Messages
344
Location
Roy's Rolls Cafe
Fine, but which part of the line is actually going to be doubled.
-- The north and south part (as per the ' Modern Railways' article'
-- or -- the north and central parts (as per earlier contributors to this thread).

The modern railways article makes perfect sense IMO. The bank is unstable and some work to stabilise backs this up. Years ago a permanent slack of 40mph was on the bank due to subsidence.

 