shedman
Member
- Joined
- 14 Feb 2011
- Messages
- 364
The other night I noticed XC have started fitting their HSTs with a PIS through out the train and a control panel for it in the TGS. There was a sign above the panel saying it is isolated and will be switched on when all the sets have it fitted and it will also control the electronic reservation system. To my knowledge only one set has been done so far but I will happily be corrected