York Scarborough Bridge Jn

Legolash2o

Member
Joined
27 Sep 2018
Messages
461
Hi all,

I've always been curious why the York Scarborough Bridge Jn goes into a single and the immediately into double track again? The only reason I can think of it that it would reduce the amount of points along the track from four to two.

YS.png
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
25,889
There was a thread a couple of years ago that attempted to explain this:
The general view is it reduces the required S&C quite considerably
 

Legolash2o

Member
Joined
27 Sep 2018
Messages
461
There was a thread a couple of years ago that attempted to explain this:
The general view is it reduces the required S&C quite considerably
Thank you!
 

Top