Day 431: Friday 10/01/2025 - Warrington Central to Chesterfield - £23.90 - Off-peak Return. Stockport to Cheadle Hulme - £2.35 - Off-peak Return. CP Winwick St CP Warrington - £2.50 (cash only machine too!!)
Total time today 424 mins - time on trains 232 mins and time waiting 192 mins. No platforms (again..) but a (very?) rare curve as well as track in Manchester that has eluded me for ever it seems.
"Stockport nil - Manchester two" or "Sheffield avoidance"
Well, today is the day i finally do the Sheffield avoiding West/South Dore Curve - both ways too dontcha know - and in pristine daylight! Its been available all week but with a poorly motor to fettle and the weather not being too kind i boxed myself into a corner so today had to be the day.. I have been looking for this for a number of years now so was going to make doubly sure i would take advantage. With my car available again just in time to make the 10.19 from Warrington Central there was no wait to speak of and onto a Turbostar for the trip over the Pennines. What a drone machine it turned out to be, and fairly busy too although quite a few did alight at various points over the Hope Valley section to make it less crowded by the time i alighted at Chesterfield where at least i could keep out of the cold.
There were two or three other chaps who alighted here too all busy noting things down so i wasn't alone in that regard. The return was on a 2 car 158 set - also busy and probably holding more passengers than the 3 car earlier. Notable for the number of people seemingly holding conference calls upon leaving Chesterfield and none reconnecting (thank goodness) once we crawled through the tunnel between Dore and Grindleford. "hello" hello" "i'm in a tunnel" and suchlike before giving up basically. Haha.
The trip over the Pennines today was fabulous. A very snowy backdrop, with a winters sun and no cloud anywhere to be seen (nor any wind thinking about it). Well worth the price of admission for once. Next up was a pointless trip to Cheadle Hulme. RTT shows the Alderley Edge trains departing Stockport onto the Fast line immediately, and something i still needed. I will probably still need this for a good while longer as it stayed on the slow and a plow through RTT for the last few weeks show the move has not been made at all in that period. No matter, upon returning the EM trains all do a P3 departure at Stockport before moving to the slow line at Slade Lane Junction. Wrong... it was so late there was no need for it to do this and so left from p4. The following service was also 20 mins late at this stage as well. Stockport once again fails to score - third time in three visits now... This is getting personal.
Perhaps my last move of the day from Oxford Road would be more successful? Well it turns out the service still showed on RTT but was missing altogether on the boards a good hour before it was due. hmmm. More on this later. In the meantime i noticed a service showing on P3 (rarely used) going to Lime St and it was a TP service. I still need the P3 track on the Piccadilly side so i scrambled to to get myself on board a service in P4 about to leave for Piccadilly and hopefully in time to get the TP back. It turns out it was a starter from p3 so a wasted trip. It did kill a bit of time though. Some time later i had 2 minutes to suss out why a NT service had just pulled into P3 going East. Yup it was definitely going to the Airport. Could i get up and down the stairs in time though. Just about, as it was stopping there to allow another airport service to pass in the P4 loop. Not seen that before but i am sure it happens at busy times. So another bit of track in the bag. Ostensibly common but in reality probably not. The move i wanted should end in a crossover to P1 at Warrington Central but they seem to be either cancelled or rarely cross over as planned it seems on checking back. More research needed then.
Once at Piccadilly i noticed the next EM going to Lime Street would terminate at Oxford Road. This would be a win whatever happened - unless they terminated in P2 - but then where would they stable it? I was hoping for a P1 arrival for the win for track from the East, or a P3 arrival and the crossover needed to get there. Turns out it was a P1 arrival where it would turn into the Norwich service in about 50 mins time (it was a while anyway). 2 bits of unexpected (and awkward for me at least) bits of track saved my day although the Dore Curve was the real big win of course.
No idea where i am out next yet but almost certainly a Sunday outing this weekend. Possibly the Hope Valley again, but it could be Sussex just as easily. The weather and the state of the motor will dictate which it is, or none of the above if too adverse.
Warrington Central | Depart | 10.20 | ***** | EM | | | stations | platforms |
Chesterfield | Arrive | 12.01 | P2 | EM | wait 24m | | completed | completed |
Chesterfield | Depart | 12.25 | P1 | EM | | | | |
Stockport | Arrive | 13.27 | P3 | EM | wait 24m | | | |
Stockport | Depart | 13.51 | P1 | NT | | | | |
Cheadle Hulme | Arrive | 13.55 | P2 | NT | wait 28m | | | |
Cheadle Hulme | Depart | 14.23 | P1 | NT | | | | |
Stockport | Arrive | 14.27 | P4 | NT | wait 18m | | | |
Stockport | Depart | 14.45 | P4 | EM | | | | |
Manchester Oxford Road | Arrive | 14.57 | P2 | EM | wait 5m | | | |
Manchester Oxford Road | Depart | 15.02 | P4 | NT | | | | |
Manchester Piccadilly | Arrive | 15.05 | P13 | NT | wait 3m | | | |
Manchester Piccadilly | Depart | 15.08 | P14 | TP | | | | |
Manchester Oxford Road | Arrive | 15.10 | P2 | TP | wait 54m | | | |
Manchester Oxford Road | Depart | 16.04 | P3 | NT | | | | |
Manchester Piccadilly | Arrive | 16.08 | P13 | NT | wait 18m | | | |
Manchester Piccadilly | Depart | 16.26 | P14 | EM | | | | |
Manchester Oxford Road | Arrive | 16.29 | P1 | EM | wait 18m | | | |
Manchester Oxford Road | Depart | 16.47 | P5 | NT | | | | |
Warrington Central | Arrive | 17.24 | ***** | NT | | | | |