• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by ABB125

  1. ABB125

    Rail Charging Converter system by Siemens

    Thanks, that's fascinating. Do you know what the dotted lines mean? I'm guessing"out of service" or similar?
  2. ABB125

    Rail Charging Converter system by Siemens

    Out of interest, where is this diagram from?
  3. ABB125

    Midlands Rail Hub 20m extra seats

    Very interesting numbers in this bit: Presumably both Bromsgrove and Redditch will get one extra train per hour (so back to 2019!), which would imply they should get the same number of extra seats? Assuming that class 730 pairs run all services, as was planned when the fleet was ordered.
  4. ABB125

    Major Engineering Work Planned at Clifton (Cumbria) to Replace WestCoast Mainline Bridge Over M6 - Jan 2026

    As in, the planned work schedule is incompatible with the access rights granted to operators? (So essentially the plan is "too disruptive"?)
  5. ABB125

    Could the Sleepers be made self-funding?

    Very mysterious... :D Of course, if Edinburgh is the key market you could run an EDB/INV service and an EDB/ABD service, which has the benefit of giving two different departure times for the Edinburgh market and, assuming we still have normal coaching stock, you could if needed have most of...
  6. ABB125

    Rail Freight Flows and News UK

    Is this with both locomotives powering, or just the one at the front?
  7. ABB125

    Could the Sleepers be made self-funding?

    So, an Edinburgh sleeper, a Glasgow/Fort William sleeper, and an Inverness/Aberdeen sleeper? The last of which could run straight from London to Stirling via Coatbridge on electric then split there?
  8. ABB125

    Leeds-Bradford Signalling

    That's, that's very useful
  9. ABB125

    Does anybody have a map of UK rail freight services ?

    But the line towards the quarries is rather less thick...
  10. ABB125

    Does anybody have a map of UK rail freight services ?

    There's a surprisingly large amount of freight on the GWML east of Reading in that map. Not something I was expecting to see necessarily
  11. ABB125

    Leeds-Bradford Signalling

    I'm doing some research on the Leeds-Bradford line via Bramley. From looking at some recent cab ride videos, the signals going towards Bradford are all 3-aspect, whereas going towards Leeds the majority (but not all) are 4-aspect. Why is this? It's not a situation I've come across before (from...
  12. ABB125

    Could the Sleepers be made self-funding?

    Here's a slightly radical suggestion. Bear with me... :D ScotRail's long-distance fleet needs replacing. In addition, we can be hopeful of electrification slowly being extended northwards. So, procure some 3-car EMUs with a suitably comfortable interior. These EMUs can run in pairs or even...
  13. ABB125

    Static Frequency Converters (SFCs) - capabilities and scope for battery train operation

    Presumably those removed connections have been replaced with something else? 275/400 kV supplies instead?
  14. ABB125

    Why aren't two plus lifts, for each floor, considered when making a stations wheelchair accessible

    Apparently there's a station somewhere that's currently having 3 lifts installed. I'm told the cost is approaching £10 million. I dread to think how much it would be if 6 lifts were required instead!
  15. ABB125

    GWR Cornish Night Riviera Sleeper and GWR Class 57 updates from Long Rock

    Would a better, non-railway biased viewpoint be that the HSTs use "normal" 3-phase as you find in larger buildings up and down the country, whilst other coaching stock uses a non-standard single phase?) 1000V system?

Top