• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by Dstock7080

  1. Dstock7080

    Victoria Line 'slow mode'

    Manual operation to line speed is available on the Victoria Line
  2. Dstock7080

    Piccadilly line closure 17th & 18th May

    The first trains between Cockfosters and King’s Cross; Osterley and Heathrow will operate at weekday times. 04.40½ Osterley-Heathrow 2, 3, 5 04.45½ Cockfosters-King’s Cross
  3. Dstock7080

    What’s more efficient: overhead or 3rd rail electrification?

    On the Underground displaced current rail is a rare but possible occurrence. The new aluminium rail is lighter and is therefore held down in place, the heavier steel rail just sits on top of the pots under gravity. Ice is certainly a significant problem, new trains require a cleaner source and...
  4. Dstock7080

    2024 Tube Stock (Siemens Inspiro London)

    Two 1960 Tube Stock motor cars sandwiching a 1973 Stock trailer car containing the track recording equipment
  5. Dstock7080

    EPB farewell - 30 year anniversary

    https://www.epbpg.co.uk
  6. Dstock7080

    2024 Tube Stock (Siemens Inspiro London)

    every 6mins (10mins Night Tube)
  7. Dstock7080

    Power failure in central London, May 12th 2025

    Lots Road closed some years ago. Back-up comes in limited form from Greenwich
  8. Dstock7080

    Piccadilly Line stopping at Turnham Green.

    Piccadilly Line trains will also be serving Turnham Green in both directions until 11.30 on 31 May, as there will be no District Line service until at least 10.00.
  9. Dstock7080

    London Underground stock requests

    91077+ for South Ealing test track.
  10. Dstock7080

    SSR resignalling

    no, as it was just testing of un-commissioned areas.
  11. Dstock7080

    1992 stock Refurbishment?

    New York did precisely that in the late-80s under “The Clean Car Program”, posters up saying services will be restored once ALL the trains on one line were taken back to depot and cleaned. None were let out until all had been dealt with. Then moved onto the next Line in order. Depot security...
  12. Dstock7080

    SSR resignalling

    Yeh SMA10 and SMA12 testing weekend, with various types of rolling stock.
  13. Dstock7080

    Tyne & Wear Metro Fleet Replacement: Awarded to Stadler

    Press release for reintroduction of trains: https://www.nexus.org.uk/news/item/new-metro-fleet-returns-customer-service
  14. Dstock7080

    Aylesbury electrification - how would this happen?

    Currently 8½min running time each way on the Chesham branch, not including stand time, 3tph at best.
  15. Dstock7080

    Knightsbridge station new entrance on Hooper's Court

    Lift B (L3) is in a new shaft from the platform. Lifts A (L1-L2) repurpose the original shaft.

Top