• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by K.o.R

  1. K.o.R

    Edinburgh Tram developments

    An awful lot of "the path network" is there because of the destruction of the rail network.
  2. K.o.R

    Footbridge work at Bedhampton

    Oh dear, maybe those rusted-away sections were only the tip of a nasty iceberg.
  3. K.o.R

    SWR Metro fleet permanent withdrawals

    I feel like those "standard headlight modules" should always be black. Gives a nice delineation to the lamps imo.
  4. K.o.R

    Class 810 for East Midlands Railway Construction/Introduction Updates

    I was talking about how does a train on the ECML actually travel to St Pancras, as there is no immediately obvious link to the non-HS1 platforms from the ECML. Turns out it's actually a sizeable detour!
  5. K.o.R

    Class 810 for East Midlands Railway Construction/Introduction Updates

    How do ECML trains divert into the MML platforms at STP?
  6. K.o.R

    Edinburgh Tram developments

    Sounds a bit like the loop in Croydon. Down High Street, George VI Bridge, Lothian St and onto Potterrow which can then run parallel to the A7/South Bridge until you get to a point where traffic has thinned enough that you can bring the two directions back together?
  7. K.o.R

    Footbridge work at Bedhampton

    You're not wrong.
  8. K.o.R

    Footbridge work at Bedhampton

    Primer coat (though not on the trackward side of the ironwork!) from a couple of weeks ago. It has since been painted a rather fetching dark green. That rusted bar on the landing front and centre showing no signs of being repaired or replaced. They haven't painted it so perhaps it will be fixed.
  9. K.o.R

    Coupling coaches without using the buckeye

    In a pinch, could you couple two (say) Mark 1 coaches together by dropping both buckeyes and using the chain hooks and buffers? I imagine you wouldn't want to risk using the gangways between the two coaches in such a situation, and the small issue of neither coach actually having a chain (the...
  10. K.o.R

    Train Sounds

    Class 395 pulling away on AC.
  11. K.o.R

    Footbridge work at Bedhampton

    It would not surprise me if they wanted to close it however. The extra space would be enough for a ramped bridge.
  12. K.o.R

    Footbridge work at Bedhampton

    According to the signs the footbridge at Bedhampton is out of action until at least January, and looking at what's been done to it so far I can see why. At this point I wonder why they don't just demolish it and put a new one in. Maybe it's a listed structure?
  13. K.o.R

    50P to use the toilets at Glasgow Queen Street

    "Any net imbalance between the amount you eat and the amount you excrete while on the planet is surgically removed from your body weight when you leave: so every time you go to the lavatory there it is vitally important to get a receipt."
  14. K.o.R

    SWR Class 458 to be retained

    Very smart!
  15. K.o.R

    Gatx units off route

    To me the pause comes across as massive quotation marks around the word "service". ;)

Top