Anything to do with this?
http://www.networkrail.co.uk/improvements/Peterborough/
Thanks for that, this scheme may well cover the sidings area and they need tidying up, would be interesting to see the overall layout, it seems that they are installing a station avoider for freight.
Another reason i raised this issue/thread that there was talk of a new depot opening at Peterborough and Doncaster for train maintenance but i cannot seem to find anymore information out about this. Maybe just a rumour.
Also perhaps there going to move the FCC sidings from the south to the north side as most FCC trains leave from platform 2.
Looks suspiciously like a TPE 185 on platform 4 and a FGW HST on the peterborough page. Network Rail know something they are not telling us?...
There was an isolation in the Nene sidings meaning stock had to berth in Peterborough station overnight. This ment that there were some reversing moves using Eastfields sidings which FCC trains at least do not usually use.
Eastfield is used more than you think. 3 trains of the Nene in the moring are booked into there and 2 trains in the eveing are booked into there.
Jamie
As far as FCC are concerned, there are only two booked workings via Eastfields (XPQ) which are 5P53 at 07:19 from XPN-PBO via XPQ and 5P81 at 18:25 which is PBO to PBO via XPQ. Both are 2 x 365 and both must be worked by PBO drivers.