• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. M

    Oxted Tunnel

    Anyone know what work is going on south of the Oxted tunnel just past the M25 bridge? There is a very permanent looking and substantial temporary site set up (cabins, parking etc.) plus safe access walkways being set up alongside the line and the like.
  2. M

    East Croydon Footbridge

    The structure seems to be on the move, does anyone know how long it will take to get into place across the six platforms?
  3. M

    London Victoria Direct to Manchester

    Back when they still had the flip over train indicator boards at Victoria I was always intrigued that Manchester was shown as a destination. Was there ever a regular direct (via Clapham Junction and West London Line?) service from Victoria to Manchester and if so why and when did it cease?
  4. M

    Selhurst Depot

    Lots of work going on to re-instate sidings, anybody have any details of why, what for etc?
  5. M

    Victoria - Vent Ducts

    Above the lines to platforms 18 and 19 there are large vent ducts which terminate into three cowls per line at roughly each end of a eight car train length plus in the middle with the rectangular open cowls having rubber/neoprene skirts around them. Every time I see them I wonder if they are...

Top