Checked both OTT and Traksy and both of them are also the "wrong" way up (all putting P1 at the top of the screen).
Same issue on Railcam. Would it not be easier to have them all the same way up as the signallers?Checked both OTT and Traksy and both of them are also the "wrong" way up (all putting P1 at the top of the screen).
Are any of them the (presumably) same way round as the signallers'?
The people who draw those diagrams work hard enough already, I wouldn't want to give them another constraint. Also, what would happen when resignalling changes the orientation of the diagram? Or when consecutive boxes are the "other way up"?Same issue on Railcam. Would it not be easier to have them all the same way up as the signallers?
The trouble is that the signalling area isn't very big, and the next area along may well be the other way up. If you're going to avoid the need to change map every 5 signals then some of them will inevitably be the "wrong" way up. On Traksy we also try to have west on the left, so a Liverpool to Manchester map is always going to have Edge Hill upside down.Same issue on Railcam. Would it not be easier to have them all the same way up as the signallers?