Continuous welded rail (CWR) disturbance query

Status
Not open for further replies.

O8000

New Member
Joined
12 Sep 2023
Messages
2
Location
London
Does anyone know if a temporary rail joint can be left in CWR track after removal of a rail defect and installation of a replacement rail, and can you do stress restoration over 2 shifts, or Level 2 stress require if let traffic during the day.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

chappers

Member
Joined
5 Mar 2008
Messages
76
Does anyone know if a temporary rail joint can be left in CWR track after removal of a rail defect and installation of a replacement rail, and can you do stress restoration over 2 shifts, or Level 2 stress require if let traffic during the day.
Stress restoration can only be done if within the same shift, so if traffic has run over my understanding is that an L2 stress would be needed.

Although in some cases the TME may grant a dispensation. All dependent on the specifics of the situation
 

O8000

New Member
Joined
12 Sep 2023
Messages
2
Location
London
Stress restoration can only be done if within the same shift, so if traffic has run over my understanding is that an L2 stress would be needed.

Although in some cases the TME may grant a dispensation. All dependent on the specifics of the situation
This is my understanding too, but there is nothing in the standards to back me up, and there is no official dispensation. And I have been told it can be done no dispensation require.
 