Philip
On Moderation
How many 196s will EWR/Chiltern/WMT be using once the line is open between Oxford and Bletchley?
Is it confirmed that 196s will be used?How many 196s will EWR/Chiltern/WMT be using once the line is open between Oxford and Bletchley?
How many 196s will EWR/Chiltern/WMT be using once the line is open between Oxford and Bletchley?
Is it confirmed that 196s will be used?
Do WMT have enough for that... the 175s would work quite well for the route...I read some time ago that initially six of WMT's 2-car Class 196 units will be used to provide EWR services until EWR's own fleet of around a dozen 3-car units is built.
That was certainly the original plan, I've not heard that it has changed.
Do WMT have enough for that... the 175s would work quite well for the route...
There is sense in 175s to Chiltern, releasing LHCS and some 165s, and use them (or indeed 165s) on EWR.
There is sense in 175s to Chiltern, releasing LHCS and some 165s, and use them (or indeed 165s) on EWR.
No trains at all would be worse, however.Using 30+ year-old 75mph stock on a shiny brand new 100mph railway wouldn't be a great look...
No trains at all would be worse, however.
165s are too slow for EWR. Chiltern should run the initial service and be given the 175 fleet.There is sense in 175s to Chiltern, releasing LHCS and some 165s, and use them (or indeed 165s) on EWR.
165s are too slow for EWR. Chiltern should run the initial service and be given the 175 fleet.
especially as they wouldn't be able to meet timings needed for the proposed timetable...Using 30+ year-old 75mph stock on a shiny brand new 100mph railway wouldn't be a great look...
It'd be interesting to see what the paths were timed for when the analysis was done. I suspect 165s were used to prove the concept, although can't prove it directly.165s are too slow for EWR. Chiltern should run the initial service and be given the 175 fleet.
It's not an immediate prospect, but a Full Business Case study is about to be commissioned for the Cowley branch line, and the intention appears to be that it'll be served by the Chiltern services running through Oxford station. So it's plausible that the bays might be freed up in the next few years anyway.How will that fit in with Chiltern's 2 TPH from Oxford to Marylebone? There would have to be some creative timetabling / very brief turn round times to fit all those trains in the bays, along with the various GWR movements that also use the bays.
The timetable won't work unless they are 100mph units.I am not sure on speed - it is a 100mph line but little more than a country branch in practice. I do however agree that as the only major operator of DMUs in the area Chiltern should indeed operate it.
A random 100mph unit would have been used in the modelling. It certainly wasn't a 165.It'd be interesting to see what the paths were timed for when the analysis was done. I suspect 165s were used to prove the concept, although can't prove it directly.
A random 100mph unit would have been used in the modelling. It certainly wasn't a 165.
The random 100mph unit was a 185 so they're already pretty optimistic.A random 100mph unit would have been used in the modelling. It certainly wasn't a 165.
Not much to discuss in the way of rolling stock. The current plan is for six Class 196/0s (2-car units) to be sub-leased from WMT initially.
Created as a spin-off to discuss/speculate about potential operators and rolling stock for EWR.
I keep hearing in various places that that is by no means confirmed and may not happen. Plus even if it does it doesn't confirm that WMT will operate them; they could be based at Bletchley or even Aylesbury and just sent to Tyseley for heavy maintenance.
I assume that would be for Oxford - Bedford services, with frequencies at 1tph at most? Once Bedford - Cambridge services are started, along with an increase to 2tph Oxford - Cambridge (and any other intermediary services), more stock will be needed.The current plan is for six Class 196/0s (2-car units) to be sub-leased from WMT initially.
I assume that would be for Oxford - Bedford services, with frequencies at 1tph at most? Once Bedford - Cambridge services are started, along with an increase to 2tph Oxford - Cambridge (and any other intermediary services), more stock will be needed.
My guess (long-term) would be to use 4-car FLIRT's (755's?), or a bi-mode Aventra. If it was all electrified, the dormant 379's could be used (with some light refurbishment)...
IMO Cross-Country makes more sense (especially given their experience with 170's between Stansted and Birmingham) in the longer term, given that it is a cross-country type route, and Cambridge is rather far away from the Chilterns...Long term I think it will be operated by Chiltern using whatever they're using, including it being electrified as part of that.
Would be decent options, the interior is the same as an intercity (745's), they are fast and quiet due to the power-pack design. Downsides are (like all UK FLIRT's) are the width and floor height (should be designed to the standard 1100mm, even if it gives level boarding at some stations)I would love to see 755s operating on this service. They are excellent trains although neither Chiltern or WMT operate them.
End of this year, I'd assume. Crew training will take 6-9 months (main limitation is drivers). I don't even think all of the 196's have been delivered to WMR yet, and would likely be needed until the 730's arrive (whenever that will be)If the train service between is due to start in early 2025, when does the train operator need to have stock in place to train staff?
The FLIRT floor height is designed to match the UK standard platform height, that really isn't a disadvantage, it is a key advantage of them, level boarding is game changing, and all new trains really should require matching the standard platform height for level boarding, as well as gap fillers like on the FLIRTWould be decent options, the interior is the same as an intercity (745's), they are fast and quiet due to the power-pack design. Downsides are (like all UK FLIRT's) are the width and floor height (should be designed to the standard 1100mm, even if it gives level boarding at some stations)
End of this year, I'd assume. Crew training will take 6-9 months (main limitation is drivers). I don't even think all of the 196's have been delivered to WMR yet, and would likely be needed until the 730's arrive (whenever that will be)
IMO Cross-Country makes more sense (especially given their experience with 170's between Stansted and Birmingham) in the longer term, given that it is a cross-country type route, and Cambridge is rather far away from the Chilterns...
IMO Cross-Country makes more sense (especially given their experience with 170's between Stansted and Birmingham) in the longer term, given that it is a cross-country type route, and Cambridge is rather far away from the Chilterns...
I would love to see 755s operating on this service. They are excellent trains although neither Chiltern or WMT operate them.
If the train service between is due to start in early 2025, when does the train operator need to have stock in place to train staff?