East-West Rail: Progress and updates

Discussion in 'Infrastructure & Stations' started by aylesbury2, 27 Apr 2014.

  1. richieb1971

    richieb1971 Established Member

    Messages:
    1,489
    Joined:
    28 Jan 2013
    I'm not so sure. That document you linked went to every home in the form of a leaflet in central and north Bedfordshire. Bedford Midland has had a lot of bad luck with train timetables and OHLE works lately. The station itself is overly congested with trains and has become a bottleneck.

    I don't have the answers, but Bedford wants it wants and although funding has been granted to upgrade the station (Abellio report) it doesn't say anything about the lack of platforms available when the THL trains have at least 2 out of 3 of them for the most part of the day. Add EWR there and you have more congestion. If you read back though we did find that a 3 car unit will fit into p1A at Bedford. Which means if it stays that way Bedford Midland can accommodate EWR until the Cambridge section is built.
     
  2. Neen Sollars

    Neen Sollars Member

    Messages:
    147
    Joined:
    21 Jul 2018
    You can have a cab ride from Fenny Stratford over the Bletchley flyover here. Double track bridge will be needed over a road, and not much room for platforms after the Milton Keynes line runs in from the right. The new platforms really will be "High Level" and curved. Tight curves all round so probably a 15 to 20 mph speed restriction. Chord northbound from WCML running in from the left (as per the fox) looks possible, but no north chords at Bicester or Oxford x2 for strategic network. Edit: Lack of overhead juice would also pose a problem.

    ""
     
    Last edited: 25 Aug 2019
  3. The Planner

    The Planner Established Member

    Messages:
    9,280
    Joined:
    15 Apr 2008
    40mph through the platforms (106m long) and realigned Flyover Summit Jn towards Denbigh Hall, 25mph junction towards Fenny Stratford. Line stays single over that bridge. Not sure why Bicester or Oxford needs extra chords for "strategic network" what strategic need is there for them? and don't say diversions as they are worth pennies.
     
  4. Tobbes

    Tobbes Member

    Messages:
    714
    Joined:
    12 Aug 2012
    Hmm, interesting. What sort of impact have on capacity? If the flyover was built for double track, what's the good reason?
     
    Last edited: 25 Aug 2019
  5. swt_passenger

    swt_passenger Veteran Member

    Messages:
    20,786
    Joined:
    7 Apr 2010
    The Bletchley High Level platform curvature is insignificant as shown in the TWA application drawings, I don’t think it’s a reason for concern.
     
  6. The Planner

    The Planner Established Member

    Messages:
    9,280
    Joined:
    15 Apr 2008
    Probably not a lot, depends on how many tph eventually runs over it as it isn't exactly a long distance. 3tph in each direction should't be a problem whatsoever.
     
  7. Tobbes

    Tobbes Member

    Messages:
    714
    Joined:
    12 Aug 2012
    Fair enough, I'm just a bit twitchy when I see single line sections a la BordersRail.
     
  8. Neen Sollars

    Neen Sollars Member

    Messages:
    147
    Joined:
    21 Jul 2018
    The single line bridge over the road looks a potential pinch point to me. I don`t like the thought of long freight trains having to wait to pass though it. Lets do the job properly and put a double track bridge in.
     
  9. The Planner

    The Planner Established Member

    Messages:
    9,280
    Joined:
    15 Apr 2008
    Slight difference between the lengths of the single line sections between the two schemes!
    Why would any long freight trains (not that there are going to be a cacophony of them going to Bedford) have to wait? that is what a timetable is for.
     
  10. Tobbes

    Tobbes Member

    Messages:
    714
    Joined:
    12 Aug 2012
    Agreed, but the cynic in me is ever suspicious of the thin-edge of the wedge argument - obviously I'd prefer it to be twin-track electrified 100mph from day one throughout, but clearly that's not going to happen.
     
  11. work-traveller

    work-traveller Member

    Messages:
    346
    Joined:
    18 May 2012
    Parapet removal on Bletchley Flyover (WCML spans) over the August bank holiday weekend.

    Photo1.jpg Photo2.jpg
     
  12. Bletchleyite

    Bletchleyite Veteran Member

    Messages:
    43,193
    Joined:
    20 Oct 2014
    Location:
    Up and down the south WCML (mostly)
    You know what, I was there last week and I didn't even notice!

    Why is it being removed, and what if anything will replace it? It will look quite different without this feature.
     
  13. work-traveller

    work-traveller Member

    Messages:
    346
    Joined:
    18 May 2012
    Stage one of the deck bearing replacement is to remove the degraded parapets, to be replaced with new at the end. Trail coring has already taken place to a few pier foundations for proposed strengthening works.

    However, radically different proposals for the flyover could make this all - well - redundant.
     
  14. DarloRich

    DarloRich Veteran Member

    Messages:
    22,559
    Joined:
    12 Oct 2010
    Location:
    Work - Fenny Stratford(MK) Home - Darlington
    thanks for the update @work-traveller - hope this classes as "work" by the experts here!

    (which radical proposals are we talking about - lost track!)
     
  15. Neen Sollars

    Neen Sollars Member

    Messages:
    147
    Joined:
    21 Jul 2018
    Thanks for the info and photos. Preparatory/enabling works really are ongoing. Nothing in public domain about radically different proposals for the flyover afaik so perhaps work-traveller will clarify unless confidential. As HS2 is going to be delayed/scrapped/or modified East West Rail could be fast tracked/upgraded.
     
  16. The Ham

    The Ham Established Member

    Messages:
    6,228
    Joined:
    6 Jul 2012
    Fast tracking East West Rail would be a good thing, however I doubt it would do much to relieve capacity constraints on the WCML or others.

    Anyway the current evidence is that HS2 hasn't reduced spending on the rest of the network and given that East West Rail also sits outside of Network Rail spending (and there's no suggestions that it's seen spending cuts either, unless someone has evidence to that fact) then a change to HS2 spending wouldn't equate a change in other rail spending.

     
  17. Tobbes

    Tobbes Member

    Messages:
    714
    Joined:
    12 Aug 2012
    Apparently E-W Rail has been declared a Nationally Significant Infrastructure Project, allowing the use of Development Consent Orders (DCOs). Can anyone translate what this means into an impact on the project and its delivery, please?
     
  18. Bald Rick

    Bald Rick Established Member

    Messages:
    9,985
    Joined:
    28 Sep 2010
    Nothing really, it was always expected to be that and AIUI built into the schedule. A DCO is just a more meaty version of an Order under the Transport and Works Act (TWA). You need to have a pretty detailed level of design completed, along with an Environmental Statement and Statutory consultation, before you can start the process.
     
  19. Tobbes

    Tobbes Member

    Messages:
    714
    Joined:
    12 Aug 2012
    Thanks very much @Bald Rick
     
  20. petersi

    petersi Member

    Messages:
    432
    Joined:
    24 Apr 2012
    Does it reset the current TWA Process and public enquiry. Or only effect future stages ?
     
  21. Bald Rick

    Bald Rick Established Member

    Messages:
    9,985
    Joined:
    28 Sep 2010
    Future stages. Current TWA should continue.
     
  22. Chonner

    Chonner Member

    Messages:
    13
    Joined:
    6 Apr 2018
    Reading the article closely, the NSIP Status seems to be for the Central Bedford to Cambridge section, while the current TWAO process is for the Western (Phase 2) Bicester to Bedford section, so should be unrelated.
     
  23. work-traveller

    work-traveller Member

    Messages:
    346
    Joined:
    18 May 2012
    Update: Inspector's report (TWAO EWR Phase 2) submitted to the DfT last week. That's over a month late, for an inquiry that only needed to sit for half of it's allotted time.
     
    Last edited: 7 Oct 2019
  24. ewrfan

    ewrfan New Member

    Messages:
    1
    Joined:
    Friday
    Location:
    Bedford
  25. hooverboy

    hooverboy Member

    Messages:
    835
    Joined:
    12 Oct 2017
    nothing new to see here.

    it was always going to be an act of "environmental vandalism",as they wish to call it.

    beside the point that it's very much the lesser of two evils.
    failure to have some kind of link means endlessly worse traffic jams with more and more static cars in traffic jams pumping out more and more noxious substances.
     
  26. option

    option Member

    Messages:
    344
    Joined:
    1 Aug 2017
    It's the link road that's called that

     
  27. Oxfordblues

    Oxfordblues Member

    Messages:
    250
    Joined:
    22 Dec 2013
    I went out for a bike ride round Bicester yesterday. I was impressed by the new East-West Consortium construction base but it didn't appear to be anywhere near the railway, unless they're using the formation of the Bicester Airfield Branch to access the line. There's been some vegetation clearance but precious little evidence of construction work. The track has been removed in places but the platforms at Launton Station are still there 52 years after closure!
     
  28. alexx

    alexx Member

    Messages:
    63
    Joined:
    17 Sep 2015
    Unless it's moved recently, the compound is next to the roundabout at Charbridge Lane and Bicester Road, just before you go over the bridge into Launton. I understood that there wouldn't be much to see until the TWAO gets signed off.
     
  29. DarloRich

    DarloRich Veteran Member

    Messages:
    22,559
    Joined:
    12 Oct 2010
    Location:
    Work - Fenny Stratford(MK) Home - Darlington
    The TWAO need sot be approved before any construction work starts.
     
  30. Gathursty

    Gathursty Established Member

    Messages:
    1,805
    Joined:
    31 May 2011
    Location:
    Wigan
    Does anyone else get the feeling like EW Rail is not going to happen?
     