Extending Elizabeth Line trains to 11 coaches and/or 30tph

Status
Not open for further replies.

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,418
Loadings on the Elizabeth Line seem to have been higher than expected. It was built with the capability to take 11 coach trains (up from 9 currently) and up to 30 trains per hour (up from 24 currently). Has there been any information on what might trigger these increases in capacity or which would come first? What do you all think would be better?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JonathanH

Veteran Member
Joined
29 May 2011
Messages
21,361
Loadings on the Elizabeth Line seem to have been higher than expected. It was built with the capability to take 11 coach trains (up from 9 currently) and up to 30 trains per hour (up from 24 currently).
Loadings haven't been that high. It might help if passengers spread along the trains a bit better. A 9-car 345 is built to accommodate 1500 passengers at crush load.

Has there been any information on what might trigger these increases in capacity or which would come first? What do you all think would be better?
It is discussed here together with the issues - 30tph first before train lengthening https://www.railforums.co.uk/thread...rmed-for-november.236191/page-10#post-5878541
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,418
Loadings haven't been that high. It might help if passengers spread along the trains a bit better. A 9-car 345 is built to accommodate 1500 passengers at crush load.
Sure, I meant if passenger demand kept increasing (particularly after May when the full route opens, and the new timetable gets rid of the wait at Paddington)

It is discussed here together with the issues - 30tph first before train lengthening https://www.railforums.co.uk/thread...rmed-for-november.236191/page-10#post-5878541
Thanks, hadn't seen that
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,293
Location
london
Extending to 11 cars will be an issue for the shenfield branch as many of the stations already have the last 2 carriages hanging out the back as they can't extend the platforms easily, imagine having nearly half the doors unusable at some stations like Maryland
 

PGAT

Established Member
Joined
13 Apr 2022
Messages
1,843
Location
Selhurst
Extending to 11 cars will be an issue for the shenfield branch as many of the stations already have the last 2 carriages hanging out the back as they can't extend the platforms easily, imagine having nearly half the doors unusable at some stations like Maryland
That’s really not an issue, SDO exists and most passengers know which carriage to be in.

Also slightly off topic, but won’t an 11 car 345 be the longest passenger train in regular service? (250m, equivalent to the length of 12.5 cars of an electrostar)
 
Last edited:

AJDesiro

Member
Joined
10 May 2019
Messages
856
Location
Rugby
That’s really not an issue, SDO exists and most passengers know which carriage to be in.

Also slightly off topic, but won’t an 11 car 345 be the longest passenger train in regular service? (250m, equivalent to the length of 12.5 cars of an electrostar)
No, that distinction would still go to the class 374s, at 390m.
 