absolutelymilk
Established Member
- Joined
- 18 Jul 2015
- Messages
- 1,418
Loadings on the Elizabeth Line seem to have been higher than expected. It was built with the capability to take 11 coach trains (up from 9 currently) and up to 30 trains per hour (up from 24 currently). Has there been any information on what might trigger these increases in capacity or which would come first? What do you all think would be better?