Noticed that the last train up to Ebbw Vale Last Night\ Early this morning ran back ECS as far as Park Junction and terminated, instead of running all the way back to Canton.
http://www.realtimetrains.co.uk/train/V94428/2017/10/29/advanced
map ref
Q1. Is this related to SWML works?
Q2. Would the unit have been put in the single siding that remains there, or just held at the lights?
Q3. Would the signaller have kept an eye on the unit from the box, or the train crew had to stay with it?
cadoxton
http://www.realtimetrains.co.uk/train/V94428/2017/10/29/advanced
map ref
Q1. Is this related to SWML works?
Q2. Would the unit have been put in the single siding that remains there, or just held at the lights?
Q3. Would the signaller have kept an eye on the unit from the box, or the train crew had to stay with it?
cadoxton
Last edited: