6M31 left Thrislington at 7:29 this morning for Arcow. Just curious, why is a train leaving a quarry to go to another quarry? Also why was it cancelled half way through its journey at Milford Jnc.?

Cheers Mike
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
3,850
6M31 left Thrislington at 7:29 this morning for Arcow. Just curious, why is a train leaving a quarry to go to another quarry? Also why was it cancelled half way through its journey at Milford Jnc.?

Cheers Mike
The S+C was closed today due to snow.



MARK
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
31,317
Location
Fenny Stratford
6M31 left Thrislington at 7:29 this morning for Arcow. Just curious, why is a train leaving a quarry to go to another quarry? Also why was it cancelled half way through its journey at Milford Jnc.?

Cheers Mike
maybe moving wagons/locomotive or testing some sort of clearance en route.
 

Oxfordblues

Member
Joined
22 Dec 2013
Messages
869
I wonder if it might be a way of moving less-than-trainload consignments from Thrislington to Hunslet, Brindle Heath or Bredbury?
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,368
Location
Rochdale
We were looking the other week and got talking about the Peak Forest to Hardendale stone train. However we did find that Hardendale seems to be closed as a quarry but the pulverising equipment is being used on a stone train from 120 miles south. It all makes sense somewhere.
 

Adrian Barr

Member
Joined
2 Jul 2020
Messages
448
Location
Doncaster
6M31 left Thrislington at 7:29 this morning for Arcow. Just curious, why is a train leaving a quarry to go to another quarry? Also why was it cancelled half way through its journey at Milford Jnc.?

Although the schedule was cancelled at Milford Junction, I think it ended up being diverted into Doncaster Down Decoy sidings.

Empty wagons are often stabled at Thrislington.

Yes, there's a particular set of GBRF box wagons (MJAs) that sometimes stables at Thrislington if not required for several days. The workings for this set generally start empty from Doncaster, but there is limited siding space in the usual GBRF stabling locations at Down Decoy and Hexthorpe.

Although there have been very occasional loaded workings from Thrislington, it's mostly used just to stable the set. See this thread - https://www.railforums.co.uk/threads/thrislington.220155/

Recent workings for these MJAs have mainly been Arcow to Ashburys (recessing at Down Decoy before continuing to Ashburys on a different schedule) or Rylstone to Scunthorpe.

There's another set of MJAs based at Doncaster dedicated to the Hull - Ferrybridge gypsum workings
 