    Progress on Avanti West Coast's 805/807s Hitachi AT300 sets

    It will interesting monitoring the performance of the 800’s under the new MU profile. I expect the times to vary quite a lot initially depending on the mindset of the driver. Even when driving within the ‘Professional Driving Policy’ driving styles vary a surprising amount. Some drivers focus on...
  2. The Chimaera

    Progress on Avanti West Coast's 805/807s Hitachi AT300 sets

    The drivers themselves will work out what new braking points to use and everyone will probably do it slightly differently. I wouldn’t expect much time saving at least initially until people can get in to a new routine. Even then some of the shorter raises in linespeed might not be really worth...
  3. The Chimaera

    Tail Gunner…The Jolly Fisherman..

    The dry weather was exactly the reason, there’s lots of dead and dried out vegetation on the linesides. It doesn’t take long to dry out after rain and burns very easily as proved at Ribblehead earlier in the week. Network rail are rightly very nervous about it and won’t let steam run at all...
  4. The Chimaera

    Class 390 coupling.

    Pendo’s can’t and never have run in multiple. Instructions forbid coupling of electrical boxes. They can couple mechanically Pendo to Pendo for rescue purposes but to do so the list of other stuff to be done was pages long and never put into practice except for testing as far as I remember. The...
  5. The Chimaera

    Beattock Landslip disruption (21/02)

    I wonder how a thread about a landslip has descend into another union bashing exercise? Playing to people’s prejudices perhaps? As I said yesterday there is nothing stopping ad hoc double tripping during disruption to services in the T&C’s, at least that was my interpretation of the agreement...
  6. The Chimaera

    Beattock Landslip disruption (21/02)

    This applies to booked work only, doing so at times of disruption is not barred at all. I believe single line working has now been brought in.
  7. The Chimaera

    GWR Sunday Cancellations - crew availability - why?

    Instructor Drivers to command a (slightly) higher salary so the bean counters would first have to get their heads around that. Being an Instructor isn’t an easy job and not everyone is cut out for it. Even amongst those that are a significant number wouldn’t entertain the idea because of the...
  8. The Chimaera

    Acton Main Line to Acton Wells Jct electrification

    These photos were from early October near Acton West Jn, the structures you can make out appear to be all new and the black plastic on the ballast is hiding new concrete foundations.
  9. The Chimaera

    Locomotive Services Fleet (LSL) updates

    I believe so, the Cumbrian coast line was blocked by flooding near Ulverston so it wasn’t possible to get back to Barrow.
  10. The Chimaera

    Locomotive Services Fleet (LSL) updates

    It was held at Marsden because of a broken rail near Stalybridge.
  11. The Chimaera

    Lioness Line/Watford DC connection to WCML at Watford Junction

    That crossover was only installed in the last couple of years with the rebuilding of Watford North Jn.
  12. The Chimaera

    Sprinters - need to replace on safety grounds?

    Would it be wrong of me to point out that if the damn lineside trees were cut down there wouldn’t be much of a problem in the first place?
  13. The Chimaera

    Aviemore incident 29/9/23

    It’s worrying that the engine was being moved without anyone being able or bothering to look where it was going. Any number of people could have been on the track in front of it. The most basic of safety measures were being ignored.
  14. The Chimaera

    Locomotive Services Fleet (LSL) updates

    As I commented earlier, classes I have had dealings with 31/4, 37/4, 47/4, 57/3, 86, 87, 90 all could happily provide ETS with no key in the desk. They were designed that way so they could heat stock in sidings without traincrew being present. Just the watchful eye of maintenance or ground...