Last rumour that was whispered about was, budgetary issues, Siemens came back with a very very high per unit refit cost. So was back to the drawing board. Possibly a bit of a hybrid keeping the middle 2 coaches as 2+3 with retrims and new carpets. With the 2 driving coaches getting the new 2+2...