http://www.cambridge-news.co.uk/news/cambridge-news/software-update-needed-door-opening-13091832 is a story in the Cambridge News about the slow opening of the doors for a 387 at Cambridge North.
A rail passenger says the doors on a train he was travelling on did not open when it pulled into the new Cambridge North station.
Adrian Stevens tweeted: "Trains not opening doors at new #cambridgeNorth. Class 387 GPS software doesn't like the station!"
He then posted a tweet thanking the driver for releasing the doors manually so passengers could get off.
Train operator GTR has admitted software needs to be updated, but has added that there is no need for each door to be opened singly and manually.
The company said the software allows trains to work out where they are, and this has to happen before the doors can be opened.
Last edited by a moderator: