Xenophon PCDGS
Veteran Member
Moderator note: Split from https://www.railforums.co.uk/threads/manchester-metrolink-trafford-centre-extension.171586/
Could the new Trafford Centre line use any of the existing M5000 tram units before the arrival of any new trams, by having single tram units running the service in the way that the Airport line always has had, by reducing the number of double units on other lines?
Could the new Trafford Centre line use any of the existing M5000 tram units before the arrival of any new trams, by having single tram units running the service in the way that the Airport line always has had, by reducing the number of double units on other lines?
Last edited by a moderator: