Yindee8191
Member
- Joined
- 16 Mar 2019
- Messages
- 164
Does this mean the TBMs aren’t launching until May? That would be a bit disappointing considering the given date was ‘early 2021’.Chiltern tunnel TBM is due to receive 8 toilets in May
Tunnel Boring Machine Toilets - Short Deadline - UK Construction Online
To supply and deliver 8 no. toilets for our Tunnel Boring Machines. Semi-permanent toilets to be installed on the TBM Toilet itself should be removed from its place, with method of emptying it. Limited intervention of emptying the toilet is a major considwww.ukconstructionmedia.co.uk
Are TBM toilets usually procured separately to the TBMs?