Thought I'd post a few photos of progress.
Llanhilleth showing new lifts and footbridge which have had to be located some way south of the platforms due to existing buildings proximity.
Newbridge.
Both stations seem to have a lot of loudspeakers. I counted 26 at Llanhilleth and 18 at Newbridge with a lot of posts seemingly ready for even more.
Anybody know the reasoning behind this?
Track is in place at Llanhilleth. Colas tamper was downline on the new track.