DelW
Established Member
- Joined
- 15 Jan 2015
- Messages
- 4,840
Yes, I was referring to trains going through to Portsmouth. SWR originally promised to increase those to four per hour but never delivered, and now won't happen for the foreseeable future. One would hope that a return to two semifast Pompey, one slow Pompey and one Haslemere will happen at *some* point in the future, but who knows.Off peak, there were 4 fast trains per hour to Guildford before COVID. 2 fast and 1 slow to Portsmouth, and 1 Haslemere stopper. Now we have 1 fast and 1 slow Portsmouth, and the Haslemere stopper.
It's equally disappointing that the 458/4s won't (apparently) be replacing the 450s on Portsmouth services, which was the whole point of expensively refitting them. Continuing to rebuild them, only to store them and then scrap them, is just a ridiculous waste of resources. Whatever the contracts say, that should be re-negotiable.