Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
IIRC there was uproar when an express bus was proposed for off peak times!! I have been along there and the A14 has been a car park due to an accident, the trains I worked were busier than usual as people turned to the only viable alterantive!! An express bus that gets stuck in traffic isn't...
We only get taught the basics, ie ticket selection with railcards etc and how to do timetables and pairing of equipment, plus there is only so much we ca actually access on the things. They are well overdue replacement as they are incredibly bulky and at times incredibly dimwitted and slow...
To get the new link from the East Suffolk to the Yard they have lowered the UP line under the main arch to the same level as the new track under the single arch. You don't really notice it on the train but when you look out the back/side you can see the difference in levels!
The new line under the small arch is lower because the that arch is considerably lower than the main arch...
We are all wondering at work just how the hell it is going to work!
25Kv AC is cheaper overall as there is no need for a chunky conductor rail, and the number of substations on 750V DC needed to power lots of train is quite high compared to 25Kv AC.
Plus 25Kv AC is safer for those who work on the ground, as they don't have to worry about tripping over it!
I have seen it happen when I worked there but it was usually the print at home tickets that were double booked because for some reason they were (at the time) on a separate reservation system which of course didn't get printed out with the 'normal' reservations
usually found near the stops on bay platforms/terminus platforms as due to the amount of rubbish that accumulates on the rail the train disappears from the track circuits, so the bit of metal on top helps to maintain the track circuit. They do sometimes crop up in other locations where it is a...
It depends on the type of bridge... One has just been replaced near me and the new one is a conctrete deck with ballast and normal sleepers, the old one was a steel girder with timber baulks for the rails to be fixed to.
There are toilets on P6/7, just not in use yet, and I believe that there will be a retail outlet going in over there too.
Does seem a bit odd that the messroom has clear glass in the windows, so all the punters can gawp at staff having a brew!!