Engineering works on WCML north of Preston April/May 2013 - end date ?

Status
Not open for further replies.

General Zod

Member
Joined
5 Jan 2008
Messages
565
I've been trying to book tickets which involve using TPE along the WCML north of Preston up to Glasgow but have noticed that at weekends in late April/ early May there seem to be some engineering works in the vicinity. Would anyone know when these works are scheduled to end ? I would like to avoid having to take the lengthy route via Edinburgh and hence intend to book my ticket when works are concluded.

Cheers.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
16,039
Re-laying Morecambe South Jn then I think, probably a bit of prep work at Lancaster South too.
 

furryfeet

Member
Joined
17 Apr 2008
Messages
449
I see that yet again, Virgin are getting away with the absolute minimum in terms of through trains being diverted around the engineering works.
i.e. 1 train each way on the saturday and 1 train in one direction only on the sunday.

Is it not about time that the regulator stepped in and made them run a decent through service in such instances ?

The public have already made it known that having to get a "rail replacement bus" is a turn off.
 

ushawk

Established Member
Joined
5 Nov 2010
Messages
1,965
Location
Eastbourne
I see that yet again, Virgin are getting away with the absolute minimum in terms of through trains being diverted around the engineering works.
i.e. 1 train each way on the saturday and 1 train in one direction only on the sunday.

Is it not about time that the regulator stepped in and made them run a decent through service in such instances ?

The public have already made it known that having to get a "rail replacement bus" is a turn off.

Ever perhaps thought that there isn't any extra spare paths to run extra diverted services ?
 

Toots

Member
Joined
24 Oct 2009
Messages
275
There are paths available,the problem is,unless Preston is missed out,the journey involves a train coming off,(or onto) the East Lancs,going back to Preston,the crew changing ends,and then undertaking a lengthy diversion at lower line speeds compared with the WCML.So it isn't so much availibilty of paths,more whether there would be a demand for the service.
 

Condor7

Member
Joined
13 Jul 2012
Messages
1,030
Location
Penrith
Ever perhaps thought that there isn't any extra spare paths to run extra diverted services ?

I am not in the industry so someone in a better position to myself may like to comment, however in past years the Settle and Carlisle line has coped with extensive diversions from the WCML.

I was just reading that in the early 90's it handled nearly 80 diversions over one weekend.

Even accepting that the S & C has greater passenger and freight than back then, one would presume those paths are still largely there?
 

furryfeet

Member
Joined
17 Apr 2008
Messages
449
in past years the Settle and Carlisle line has coped with extensive diversions from the WCML.

I was just reading that in the early 90's it handled nearly 80 diversions over one weekend.

Even accepting that the S & C has greater passenger and freight than back then, one would presume those paths are still largely there?
I agree with condor7's line of argument, since the S & C has been upgraded for 75mph running and has had extra IBS signalling installed to reduce the headways between trains to 15 minutes.

It cannot be a clearance issue, since both voyagers and pendolino stock has been diverted via the S & C since privatisation.

One is tempted to conclude that it is too much time/effort/cost for Virgin to organise the diversions.

Would this lack of provision be noted by the Rail Regulator, or taken into account when the franchise is re-let ?
 