South Wales 'Metro' updates

Jacob Didcote

Member
Joined
27 Mar 2019
Messages
204
Location
Barry
Not sure if this has been discussed yet: the platforms on the Trehebert line now have rolling security, that is a team of four work 12 hour shifts (two at a time) and spend around an hour per station before moving on to the next. This is expected to remain in place indefinitely.
Yeah did see them about at Dinas Rhondda…got some odd looks as I was taking photos. BTP on the train when I got back on heading South from Llwynypia!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

positron

Member
Joined
4 Jul 2023
Messages
127
Location
Cardiff
Unless there's something I've missed, there's always a minimum stipulation on newer station platforms to have clear openings of >90cm for wheelchairs (e.g. at shelters). I think any wheelchairs at Cardiff Bay will have ample room.
I meant the new one at Dinas Rhondda. It's possible it's just the angle but the gap between yellow line and lampposts doesn't seem massive given all the space
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,497
Location
Between Peterborough & Bedlington
I meant the new one at Dinas Rhondda. It's possible it's just the angle but the gap between yellow line and lampposts doesn't seem massive given all the space
It's likely that it's just the angle. Everything would have had to go through the NTSN handover process before entry (back) into service, to ensure it caters for passengers with reduced mobility.
 

StripeyNick

Member
Joined
25 Apr 2012
Messages
232
Location
Cowbridge, S.Wales
Yeah did see them about at Dinas Rhondda…got some odd looks as I was taking photos. BTP on the train when I got back on heading South from Llwynypia!
I noticed security on my dad's video. Did you get any grief for taking photos. I'd read either here or somewhere else that others had grief at Quakers Yard I think
 

Jacob Didcote

Member
Joined
27 Mar 2019
Messages
204
Location
Barry
I noticed security on my dad's video. Did you get any grief for taking photos. I'd read either here or somewhere else that others had grief at Quakers Yard I think
Hi Nick, shame to hear people are getting grief for just taking photos. Didn’t get stopped but had some odd looks and saw some whispering but it is what it is. I was waiting for one of them to say something but they were staring like hawks as I was walking around. Did see quite a bit of security up Quakers Yard a few weeks ago. Primarily saw security up Treherbert and Dinas Rhondda
 

Avowedsevern

Member
Joined
5 Jun 2023
Messages
24
Location
UK
I noticed security on my dad's video. Did you get any grief for taking photos. I'd read either here or somewhere else that others had grief at Quakers Yard I think

I went onto Dinas Rhondda station the night they removed the fencing (last Friday) at around 8pm, spent a decent amount of time on both platforms taking videos etc. Halfway through security showed up. They didn’t say anything, they just shadowed me; felt like I was under government surveillance I think I was the first non-rail worker on that platform post renovation, so that was cool.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,535
Location
South Wales
Yeah - I think this is my mistake from that post. The Form P talks about Aberdare services running via the City line explicitly; it doesn't actually discuss what happens to them when they get to Central because that's out of scope for a document that's purely about the Core Valley lines. Since it didn't mention linking Aberdare services to Merthyr services, I assumed that the Aberdare trains would reverse at Central and go back the way they came. However, the idea of running those services as a loop has been proposed for a long while, so now that it's been announced, on re-reading that the consultation documents it's clear that they didn't rule out that option, but didn't say it would happen either. Oh well.
Realtime trains has the aberdare and merthyr services linked as well as all services stopping at Treforest Estate. Good news for the cityline especially getting a hourly Sunday service. Just need the Coryton branch to get a Sunday service
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
3,666
Realtime trains has the aberdare and merthyr services linked as well as all services stopping at Treforest Estate. Good news for the cityline especially getting a hourly Sunday service. Just need the Coryton branch to get a Sunday service

On the other hand, on weekdays it looks as if the City Line only has an hourly service northbound after 9 pm, whereas the Coryton line seems to stay half hourly until the last train.
I suspect that's more trains per day than the Coryton Line has ever had.
 

Last Hurrah

Member
Joined
17 Jan 2023
Messages
67
Location
Canton
On the other hand, on weekdays it looks as if the City Line only has an hourly service northbound after 9 pm, whereas the Coryton line seems to stay half hourly until the last train.
Will evening service timings to/from Ninian Park for midweek games be more suitable, particularly post game, where currently trains to Fairwater/ Danescourt are either 9.35pm (5 minutes or so before game ends) or 11.00pm
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
2,478
I see a vacant patch of land in Cardiff between the Bay branch and where the valley lines approach Central near Bute Street. That land is currently being cleared presumably for another tower block? I really do wonder if a chord could have been inserted across this land to enable the tram-trains (Class 398) to get from Central to the Bay without having to cross any roads? I have marked such a chord in purple on the attached image.
 

Attachments

  • CARDIFF CENTRAL TO BAY CHORD.png
    CARDIFF CENTRAL TO BAY CHORD.png
    2 MB · Views: 157

Brissle Girl

Established Member
Joined
17 Jul 2018
Messages
2,664
I see a vacant patch of land in Cardiff between the Bay branch and where the valley lines approach Central near Bute Street. That land is currently being cleared presumably for another tower block? I really do wonder if a chord could have been inserted across this land to enable the tram-trains (Class 398) to get from Central to the Bay without having to cross any roads? I have marked such a chord in purple on the attached image.
That's a very good question. Given that there will be 6 tph fewer on that stretch of track than immediately south of Queen St I would have thought the capacity was there into Central. And given the additional platform 8 at Central, again, I would have thought that you could squeeze them in there.
 

takno

Established Member
Joined
9 Jul 2016
Messages
5,071
I see a vacant patch of land in Cardiff between the Bay branch and where the valley lines approach Central near Bute Street. That land is currently being cleared presumably for another tower block? I really do wonder if a chord could have been inserted across this land to enable the tram-trains (Class 398) to get from Central to the Bay without having to cross any roads? I have marked such a chord in purple on the attached image.
Looks far too tight a radius to me
 
Joined
13 Feb 2011
Messages
1,063
Location
Cardiff
Looks far too tight a radius to me
Looks too tight to me to.

The proposed plan as part of the Central > Bay link includes a stop in Callaghan Square itself.

In the interim 398s will terminate at the new platforms (9&10?) at Central, with an aspiration to extend their services further West, either potentially through the Brians Brewery site or possibly up the ramp onto the mainlines.

I think the proposed and future services would also be too much for platforms 6, 7 and 8 at Central so the street running over Callagan Square to the rear of Cardiff Central is a good development.
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
3,666
Looks far too tight a radius to me

Possibly not - the 398 depot in Taffs Well has some rather tight loops.

That's a very good question. Given that there will be 6 tph fewer on that stretch of track than immediately south of Queen St I would have thought the capacity was there into Central. And given the additional platform 8 at Central, again, I would have thought that you could squeeze them in there.

Though Queen Street has 2 platforms each way, whereas Central has one and a half available - and if you did this it would have to cope with trains turning round.

Also by changing the Bay services from a shuttle to a through service, the new service patterns already add one place where north and southbound services have to cross each others paths.
Adding another such place probably wouldn't do much for reliability.

But I think these dicussions should probably be in another thread.
 
Joined
22 Jun 2013
Messages
388
I see a vacant patch of land in Cardiff between the Bay branch and where the valley lines approach Central near Bute Street. That land is currently being cleared presumably for another tower block? I really do wonder if a chord could have been inserted across this land to enable the tram-trains (Class 398) to get from Central to the Bay without having to cross any roads? I have marked such a chord in purple on the attached image.
That land has planning permission for phase 2 of the John Street development, it will be a c. 100m tower including a hotel, office space and apartments.
 

positron

Member
Joined
4 Jul 2023
Messages
127
Location
Cardiff
I see a vacant patch of land in Cardiff between the Bay branch and where the valley lines approach Central near Bute Street. That land is currently being cleared presumably for another tower block? I really do wonder if a chord could have been inserted across this land to enable the tram-trains (Class 398) to get from Central to the Bay without having to cross any roads? I have marked such a chord in purple on the attached image.
I used to think this too but part of the reason for the new route is for new platforms at central too as the existing ones can't cope with much more traffic.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
450
"SWMetroUpdates" on Twitter has posted a drawing of the propose route across Callaghan Square:

1709635331515.jpeg


They also have some nice drone shots of the construction work around Butetown station. The construction progress certainly suggests that the station may open with one platform and then gain the second one later.
 

Zoomer

Member
Joined
16 Oct 2023
Messages
7
Location
S Wales
Great to see trains running on the Treherbert line again, but when do we think evening trains are likely to return? It feels like we've had rail replacements on Sunday to Thursday evenings for years now.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,535
Location
South Wales
Great to see trains running on the Treherbert line again, but when do we think evening trains are likely to return? It feels like we've had rail replacements on Sunday to Thursday evenings for years now.
Soon as they finish electrification work
 

Markdvdman

Member
Joined
14 Aug 2011
Messages
407
Location
Merthyr Tydfil / Gorslas
Post-Match

  • Full reinstatement of Rhymney, Treherbert, Aberdare and Merthyr services for the evening. Additional capacity added where possible.
A blanket quote as Aberdare and Merthyr evening bus replacements are no longer in place! Easier to state I suspect as more looks better!
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
2,478
"SWMetroUpdates" on Twitter has posted a drawing of the propose route across Callaghan Square:

View attachment 153656


They also have some nice drone shots of the construction work around Butetown station. The construction progress certainly suggests that the station may open with one platform and then gain the second one later.
Looking at that map, it is not clear if the new tram route is elevated or crossing roads with traffic? Why does it spend so long on the road south of the Central station and not get straight off the road into what is now the car park? The last thing we need is on street running delaying services across the wider network.

I note that we don’t have a source for this map.
 
Last edited:

MikePJ

Member
Joined
10 Dec 2015
Messages
450
Looking at that map, it is not clear if the new tram route is elevated or crossing roads with traffic? Why does it spend so long on the road south of the Central station and not get straight off the road into what is now the car park? The last thing we need is on street running delaying services across the wider network.
I agree that it looks strange, and without the rest of the drawings and design notes its hard to fathom the intent. However, let’s have a guess: the tram tracks are shown in what appears to be one carriageway of a dual carriageway road (between Central and Callaghan Square). This can’t possibly be the design intent as otherwise trams would be running into oncoming traffic! So my interpretation is that the northern (city side) carriageway is actually a bi-directional bus/tram road, with other traffic having one lane in each direction on the southern (bay side) road. By phasing the lights at Herbert St/Lloyd George Ave junction (and similarly at the junction by Central), you can allow the traffic to split and reintegrate.
 
Joined
13 Feb 2011
Messages
1,063
Location
Cardiff
Does anyone know who is behind that twitter account or where that map came from?

It doesn't appear to be anywhere else online and I'm intrigued to see the full map.
 

positron

Member
Joined
4 Jul 2023
Messages
127
Location
Cardiff
"SWMetroUpdates" on Twitter has posted a drawing of the propose route across Callaghan Square:

View attachment 153656


They also have some nice drone shots of the construction work around Butetown station. The construction progress certainly suggests that the station may open with one platform and then gain the second one later.
I'm not buying that this is authentic. For one the planning application for the original work (admittedly it was only placeholder but still) had the two tracks splitting off conventionally not going off either side for a grade separated crossing.
 
Joined
22 Jun 2013
Messages
388
I'm not buying that this is authentic. For one the planning application for the original work (admittedly it was only placeholder but still) had the two tracks splitting off conventionally not going off either side for a grade separated crossing.
I'm not sure that anyone would go to the considerable trouble of faking it!
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
3,666
I'm not sure that anyone would go to the considerable trouble of faking it!

Quite!

For one the planning application for the original work (admittedly it was only placeholder but still) had the two tracks splitting off conventionally not going off either side for a grade separated crossing.

I can see the logic to a grade separated crossing.

Otherwise anything heading from the Bay to Queen Street has two potentially conflicting movements to deal with.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,929
Location
Nottingham
I can see the logic to a grade separated crossing.

Otherwise anything heading from the Bay to Queen Street has two potentially conflicting movements to deal with.
From a study I was involved in many years ago, the existing line needs to stay above Herbert Street because there isn't enough length to get from street level onto the bridge over the main lines. That being so, if northbound trams for Callaghan Square didn't go down and under the Queen Street route as shown here, they would have to come off some way further south and run along Bute Street.
 

Smwrff

Member
Joined
27 Dec 2023
Messages
26
Location
Doha
Some news on Crossrail (Cardiff Central to Cardiff Bay)

 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
3,666
Some news on Crossrail (Cardiff Central to Cardiff Bay)


I'm a bit confused by that.

The "business case" for phase 1 hasn't yet been made, but phase 1a is already fully funded?
 