Thanks for that. Looks like it is running late. It was my belief that the turnbacks (if not the platform) had to be in place before a timetable recast could be introduced to split the Leeds/Wigan at Central and start the Stalybridge/WiganNW electrics. If contruction doesn't start until 2025...