• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. Philip Phlopp

    MML Electrification: progress updates

    Chris Grayling and hydrogen, or Chris Heaton-Harris and the Christmas cracker rejects ?
  2. Philip Phlopp

    MML Electrification: progress updates

    Checks calendar. Nope, not 1st April. Back to headbutting a wall with the words hydrogen and ****weed written on it.
  3. Philip Phlopp

    MML Electrification: progress updates

    but we were discussing gearing and motor upgrades.
  4. Philip Phlopp

    MML Electrification: progress updates

    Yes. Done already. It's a relatively small change to the motor internals to accommodate a higher RPM limit and thus increased forces on the internals. There's no other changes to the gearing etc.
  5. Philip Phlopp

    Thinks - that catenary looks familiar

    Fixed tension was the main issue - given the significant range of temperatures experienced in the UK (in respect of expansion and contraction of contact wire system) there really needs to be some form of auto-tensioning. Don't make me do frequency, resonance and wave propogation calculations at...
  6. Philip Phlopp

    Thinks - that catenary looks familiar

    You've largely covered it - lack of registration arms to provide the desired contact wire geometry means you need to use the entire catenary system to shape the contact wire to suit the curvature of the track. Which you can indeed do by tensioning of the system, compounding of the catenary...
  7. Philip Phlopp

    Thinks - that catenary looks familiar

    I do but none which can be shared due to copyright. Series 1 isn't a high speed OLE system, it's a high tension mixed traffic OLE system. It's robustness stems from the tension requirements (and in turn the wire diameter and then in turn the mass) needed for twin pantograph operation at upto...
  8. Philip Phlopp

    Thinks - that catenary looks familiar

    Even the coaching stock is the same...
  9. Philip Phlopp

    Why did TPE go for three different Nova fleets?

    Hull Trains were required, under the terms of their most recent track access agreement (resulting from their track access extension application) to introduce into service the Class 802 stock, to withdraw the Class 180 stock and to make a series of infrastructure upgrades necessary to operate the...
  10. Philip Phlopp

    Thinks - that catenary looks familiar

    There is actual Series 1 OLE in use in both India and Taiwan. Taiwan previously imported some of the old BR Mark 1 and I think Mark 3 OLE, possibly in combination with some of the stock they imported from the UK, though I'm sure foreign correspondents can confirm.
  11. Philip Phlopp

    Why did TPE go for three different Nova fleets?

    Well, the LHCS is down to the DfT franchise specification, not First Group. And in any case, a 5 car CAF DMU is still a third fleet - whilst the Civity is claimed to be a modular platform, there's little evidence of that on the ground with all sorts of key differences in components and parts...
  12. Philip Phlopp

    Is anyone able to explain this train on a suburban road?

    And that's supposing you can avoid having reversals or having to run round the stock, route conductors and so on, so could need more than one locomotive and quite a lot of traincrew to handle the traction knowledge, route knowledge and any shunting movements enroute. Which is, I hear, a bit...
  13. Philip Phlopp

    Is anyone able to explain this train on a suburban road?

    I must say, the increasing hostility to knowledgable industry personnel on this forum and the intransigent belief amongst the arm chair 'enthusiasts' that they know best is making this site much less fun than it used to be.
  14. Philip Phlopp

    Has electrification had its day?

    We're not doing electrification solely to reduce the carbon emissions of rail transportation - it is one positive aspect of rail electrification, but also resulting from rail electrification is reductions of energy intensity overall (the amount of energy needed to move one passenger one km) and...
  15. Philip Phlopp

    Is anyone able to explain this train on a suburban road?

    And what do you think the underlying issues are for the movement of a single vehicle with two different couplers ? What do you understand concerning brake force, coupling constraints and possible requirements (and issues) with translator vehicles ?
  16. Philip Phlopp

    Has electrification had its day?

    Nonsense. Total and utter nonsense.
  17. Philip Phlopp

    How could you build extra platforms at York?

    Demolish the NRM. I wouldn't even worry about removing most of the exhibits first.
  18. Philip Phlopp

    Is anyone able to explain this train on a suburban road?

    Yes - remember the railway hasn't been fully renationalised. The majority of freight operations and some passenger operations remain private enterprises which need to be billed in some way for their use of the railway infrastructure. The important part of track access charges isn't the...
  19. Philip Phlopp

    Trivia: Stations that sound nice but really aren't

    Blackpool (both North and South). There's sadly no sign of the entire resort having fallen into a pool of black fetid water.
  20. Philip Phlopp

    Transpennine Route Upgrade and Electrification updates

    A lot. The actual alignment tends to be well understood, it's the sides of the route that often throw up unexpected surprises. We've had that with mast foundations and previous widening projects, remember most of these routes were built using navvies and the focus was solely on the alignment...