• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. Nick

    Coleshill Parkway

    ta chap
  2. Nick

    Coleshill Parkway

    What two services are these then matt?
  3. Nick

    Nicest smelling station

    I don't like sniffing in high levels of sulphur, I much prefer anything from a Sulzer (tho nowt wrong with EE!) :)
  4. Nick

    A Good website for mechanical boxes

    Yea as Damon said you can be taken onto a preserved line under supervision at 14. You'll be able to work as Platform staff, possibly a trainee ticket inspector or maybe able to work 'down shed (kettle or diesel depending on your pref). Theres plenty you can do for them 4 years your waiting and...
  5. Nick

    Stallingborough Signal Box

    Hmmmm, bears all the hallmarks of a MS&LR box, speifically taken into account its location (constructed before the company became the GCR).
  6. Nick

    Stallingborough Signal Box

    By whom?
  7. Nick

    Stallingborough Signal Box

    It's actually a MS&LR box. :wink:
  8. Nick

    OHLE 25kV or 750V DC third-rail

    Interesting, but I do remember being told on the Southern region most trains were limited to 90mph I presume becuase of the strain on the current per section of each train?
  9. Nick

    OHLE 25kV or 750V DC third-rail

    Am I correct in thinking 3rd Rail systems are limited to 90mph?
  10. Nick

    OHLE 25kV or 750V DC third-rail

    My thoughts are varied, in some ways I beleive in order to in some peoples opinion 'improve' our rail network with electrification a lot of it could be done fairly cheap on 3rd rail. Since only another rail is needed and only 750v is needed as constant power as opposed to 25,000 volts (aka...

Top