As of this Sunday, the second phase of Altrincham line TMS conversion will be completed. This will follow on from the already commissioned section from Trafford Bar junction to Old Trafford & Depot Connections. This phase will bring real time running information all the way down to Brooklands (PIDs) and Line of Sight operation down to the Manchester end of Timperly station.
The next phase is a bit more complex as it requires signalling of the pocket siding which is imidiatly after Timperly station. This phase will take TMS up to the boundary between Metrolink and Network Rail. The final phase is to bring TMS through the two level crossings and Navigation Road to Altrincham. The final part is expected to be done in two halls, the first would see equipment installed for tracking purposes (which would allow PIDs to be turned on between Timperly and Altrincham) and the second the equipment used for full signalling. This final part is awarkward since it requires interface with network rail infrastructure and between the level crossings.
Regardless of this it's good that TMS is finally being migrated down phase 1 lines, the bury line will be done post Victoria rebuilding if anyone was wondering.
--- old post above --- --- new post below ---
The Altrincham line is now running with TMS down the Brooklands with the old signals bagged over and PIDs in operation!
The next phase is a bit more complex as it requires signalling of the pocket siding which is imidiatly after Timperly station. This phase will take TMS up to the boundary between Metrolink and Network Rail. The final phase is to bring TMS through the two level crossings and Navigation Road to Altrincham. The final part is expected to be done in two halls, the first would see equipment installed for tracking purposes (which would allow PIDs to be turned on between Timperly and Altrincham) and the second the equipment used for full signalling. This final part is awarkward since it requires interface with network rail infrastructure and between the level crossings.
Regardless of this it's good that TMS is finally being migrated down phase 1 lines, the bury line will be done post Victoria rebuilding if anyone was wondering.