Last year Bath was closed to rebuild both platforms, reallining to reduce curvature and raising. Following this the up platform was extended by replacing the old structure that hung off the Bristol end of the river bridge. At the time there was a suggestion the down platform would also be extended using a similar method. Since then nothing has happened and 10 car Bristol trains don't fit the platform and require SDO. Does anybody know if there are still plans to extend the down platform?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Phil G

Member
Joined
16 Oct 2017
Messages
178
According to the latest Network Rail Enhancements Delivery plan (June 2018) platform 1 is to be extended for 10 car IEP operations.
Excellent thanks for the info. That will be an interesting engineering challenge building out over the river! I look forward to watching it happen!
 