Again, YOU don't know why they don't have further trams out running this service
It's been mentioned Numerous times on this Thread (and Numerous times by people on
British Trams Online) that Staff Shortages are the issue currently plauging the tramway with problems.
as a local id prefer if they had any extra trams out to be doing more than just accommodating enthusiasts and tourists by running one of the 3 routes in full
And they have more than enough Trams in their fleet to cover an increased service.
I think it'd be overkill to have all 3 routes ran in full. You'd go from not having enough trams to having too many trams for a full timetable
They have always been affected by shortage of even employed staff however ive not heard it confirmed that they are nto running more trams in service due to a lack of staff being the sole issue
I'm having my doubts about how valid your sources are. You are the only one on here who's saying that the lack of Trams is the issue
Why are you fixated on only 2 more trams?
Because Starr Gate can only hold a Maximum of 20 Flexity 2s (They currently have 18). Unless they decide to extend it in the future
How many more Trams do you think they need to order?
Order more trams and staff those extra trams and the depot properly you mean
No. I simply mean just Staff the current amount of Trams that they've currently got properly.
If it wasn't for Staff Shortages, They'd be more than capable of running a timetable that requires 15 trams during the summer. However it'd need a complete rethink of the timetable.
I think it'd probably be best if they used the original proposed timetable for the extension (every 20 mins Starr Gate to Fleetwood, Every 20 min SG/Pleasure Beach to Bispham/Little B via North Station) and I have a feeling they could pull it off using 15 Trams.
(it'd be miles better than the T1/T2/T3 shambles that they currently have.)
Even old timetable that they had until two weeks ago (Every 15 Mins SG to Fleetwood via NS) would have been miles better than the T1/T2/T3 Shambles in the Short Term and it could have still required no more than 13 Trams to run (14 if you count the one in reserve)
You don't need to extend star gate really - you can store trams in the loop *
Not Possible. The Loop is open to the Elements (meaning they are both Vulnerable to Salt damage and Vandalism).
You'd have to either: A) enclose the loop and move the Tram Wash, B) Extend/Expand Starr Gate Depot so it can accommodate more Trams or C) build a completely nee depot from the ground up.
* And yes we are aware of Rigby Road issue however you would hope that if they were buying some more trams that they would find the money to sort out the depot too - cos the trams will take a few years to come online anyway so you would hope the issues would be sorted by then if they employed a bit of joined up thinking.
Are you suggesting that any additional Flexity 2 Trams should be stored at Rigby Road?
Heritage and LRT are 2 seperate operations so I highly doubt that it LRT Trams would ever go to Rigby Road.
I'm going to be honest, The progress at Rigby Road is stalling and judging by the speed at how that's going, an order for any additional Flexities would probably put the Heritage fleet offline for a few years (assuming they can no longer run from Starr Gate)