Stroud Valleys
Member
- Joined
- 19 Aug 2015
- Messages
- 83
Various plans I know of redeveloping Bristol Temple Meads plus resignalling.
Does anyone have any info on the plans for the ticket office and redesign of the main entrances. I heard rumours of plans to create a new link from the main entrance/ticket office to the subway, or open up a disused subway?
I was wondering whether the existing train shed that has platforms 1,2,3,4,5,6 could incorporate an additional island platform, with platforms on the side remodelled?
I also heard that the old train shed would be brought back into use, and the possibility of the platforms being renumbered with A and B ends with the new resignalling. Does that mean the platforms will be as follows:
New platform 1 (in new shed)
New platform 2 (in new shed)
2 becomes platform 3
3 and 4 becomes platform 4a/b
New platform 5a/b (new island in existing shed)
New platform 6a/b (new island in existing shed)
5 and 6 become platform 7a/b
7 and 8 become platform 8a/b
9 and 10 become platform 9a/b
11 becomes platform 10a/b
13 becomes platform 11a/b
Does anyone have any info on the plans for the ticket office and redesign of the main entrances. I heard rumours of plans to create a new link from the main entrance/ticket office to the subway, or open up a disused subway?
I was wondering whether the existing train shed that has platforms 1,2,3,4,5,6 could incorporate an additional island platform, with platforms on the side remodelled?
I also heard that the old train shed would be brought back into use, and the possibility of the platforms being renumbered with A and B ends with the new resignalling. Does that mean the platforms will be as follows:
New platform 1 (in new shed)
New platform 2 (in new shed)
2 becomes platform 3
3 and 4 becomes platform 4a/b
New platform 5a/b (new island in existing shed)
New platform 6a/b (new island in existing shed)
5 and 6 become platform 7a/b
7 and 8 become platform 8a/b
9 and 10 become platform 9a/b
11 becomes platform 10a/b
13 becomes platform 11a/b