• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Brixton Closure

Status
Not open for further replies.

Julian G

Established Member
Joined
9 Jun 2005
Messages
3,545
Brixton station improvements
26 January 2006


BRIXTON Tube station will close from April 8 to 17 to allow for the safe removal of asbestos from the site.

John Doyle, general manager of the Victoria line, said: "There is no safety risk to our customers and staff as the asbestos has not been disturbed and in that state it is safe."

"Air quality is being continually monitored by our asbestos control unit."

'Temporarily closing the station during the Easter period, when demand is reduced, is the best solution we can adopt to minimise disruption to our customers.'

During work, Victoria line trains will terminate at Stockwell.

A high frequency rail replacement bus service will operate between Stockwell and Brixton during the closure period.

London Underground tickets will be accepted on all local bus services including those connecting with local Network Rail stations.

Customers may also wish to walk between Stockwell and Brixton which takes 15 to 20 minutes.

The closure will allow Metronet Rail BCV, the company responsible for the maintenance and renewal of the Victoria, Central, Bakerloo and Waterloo & City lines, to install cables from platform switch rooms to the station operations room as part of Transport for London’s 5-Year £10bn Investment Programme.
 
Status
Not open for further replies.

Top