CSC requires a full remodelling of Basford Hall and the reconstruction of 2 overbridges, so there's not really much passive provision able to be made. BHIL is purely (now) a resignalling scheme which abolishes Basford Hall Junction, Sorting Sidings North and Salop Goods Junction signalboxes, unfortunately.Perhaps "passive provision" would be more accurate then?
There were some minor upgrade works planned but these were defunded when HS2 was cancelled.
There's not much available in the public domain. The original plan was to extend three platforms to allow 400m trains to split and join, which meant a shuffling about of the existing bays and the introduction of a new Platform 16 on the back of the existing P12 island. However whatever it will look like in the future will depend on what length HS2 trains are planned to go to Crewe, and as @The Planner says what money is made available to do something (if anything!).Are there any plans anywhere available to look at for the upgrade (if there is one) of Crewe station for HS2?