adamedwards
Member
- Joined
- 4 Apr 2016
- Messages
- 796
I've seen a number of references in the rail press that Canterbury West is due for resignalling in 2020. I assume this will also deal with the 8 car platforms, too short for a 12 Javelin, plus the odd layout at the eastern end where the London bound trains have a slow wiggle from the min line into the platform, a legacy of long removed through lines.
Has anyone seen the planned layout and what does I show?
Has anyone seen the planned layout and what does I show?