TrainGeekUK
Member
- Joined
- 15 Jun 2019
- Messages
- 109
Looks like the rush hour services at Eastbourne are in disarray this evening due to a major signalling systems failure.
Walking through the station about ten minutes ago and it's a full house of cancelled services on the boards. No services Eastbourne - Hastings/Brighton and London services terminating at Polegate.
What would cause such a major meltdown of such signalling systems?
Walking through the station about ten minutes ago and it's a full house of cancelled services on the boards. No services Eastbourne - Hastings/Brighton and London services terminating at Polegate.
What would cause such a major meltdown of such signalling systems?