For any super enthusiast insomniacs , the first working of a 185 in
passenger service will be the 0622 Man Piccadilly-Hull on Tuesday 14th
March. (The public timetable shows 06.21). It will be a 6-car train.
185s will then be introduced progressively on Airport-Cleethorpes and
Airport Barrow/NW with all 51 sets in operation by the end of 2006.
Some testing runs are taking place to Hebden Bridge but not sure which
route.
Although in theory the 185s will replace all TPE 158s there is a view
that there will not be enough units, particularly if they operate many
6-car trains, so watch this space.
TG
(I can't post this in the Rail-gen section because I got a critical error, feel free to switch the topic to Rail-gen section)
passenger service will be the 0622 Man Piccadilly-Hull on Tuesday 14th
March. (The public timetable shows 06.21). It will be a 6-car train.
185s will then be introduced progressively on Airport-Cleethorpes and
Airport Barrow/NW with all 51 sets in operation by the end of 2006.
Some testing runs are taking place to Hebden Bridge but not sure which
route.
Although in theory the 185s will replace all TPE 158s there is a view
that there will not be enough units, particularly if they operate many
6-car trains, so watch this space.
TG
(I can't post this in the Rail-gen section because I got a critical error, feel free to switch the topic to Rail-gen section)