As a follow up to a thread a few months ago where I asked about changes to stations served by TOCs since December 2019, which services have been cut and haven't been fully restored since then? I can think of (but I'm likely going to be wrong in some cases, and referring to weekday off-peak frequencies)Cuts on the Waterloo suburbans (Hounslow loop, Worcester Park/Epsom services), reduced frequencies on the lines out of Bradford F Sq to add to the list (although there is probably a separate thread for this!)
- Carmarthen to Fishguard Harbour 1tp2h to 3tpd (it doesn't sound right that it was that frequent in 2019)
- London Marylebone to Gerrards Cross and High Wycombe stoppers merged
- Marylebone to Aylesbury via Princes Risborough becoming a Princes Risborough shuttle
- Marylebone to Banbury cut from 1tph to 1tp2h
- Marylebone to Birmingham Snow Hill cut from 1tph to 1tp2h
- Marylebone to Stratford-upon-Avon not running south of Leamington Spa
- Cardiff Bay to Queen Street cut from 5tph to 4tph (with 2tph through to Pontypridd)
- Nottingham to Mansfield Woodhouse cut / merged with Nottingham to Worksop
- Moorgate to Welwyn Garden City / Hertford North each cut back from 4tph to 2tph
- King's Cross to Cambridge stopper cut from 2tph to 1tph to Cambridge and 1tph to Letchworth
- Paddington to Bedwyn split at Newbury
- Watford Junction to St Albans Abbey cut from 4tp3h to 1tph
- LNR Euston to Birmingham New Street cut from 3tph to 2tph with one terminating at Milton Keynes Central
- Snow Hill lines left with 2 fewer tph (6tph to 4tph for Stourbridge, 3tph to 2tph for Solihull and Wythall) and no Chiltern between Stourbridge Junction and Kidderminster
- I think there were Preston to Manchester Victoria and Liverpool Lime Street to Warrington Bank Quay services pre-Covid, neither of which I can find clear extra alternatives for
- Liverpool Lime Street to Manchester Oxford Road cut from 2tph to 1tph and 1tph Liverpool to Warrington Central
- Manchester Piccadilly to Rose Hill Marple cut from 2tph to 4tp3h
- Leeds to Huddersfield via Bradford Interchange not running between Leeds and Bradford
- Bradford Forster Square to Ilkley / Skipton each cut from 2tph to 1tph
- Leeds to Harrogate cut from 3tph to 2tph (excluding 1tp2h LNER), but with Knaresborough to York increasing from hourly to 2tph
- Sheffield to Gainsborough Central no longer running with Leeds to Lincoln Central services taking up the calls
- Doncaster to Scunthorpe stoppers cut from 1tph to 1tp2h
- Sheffield to Hull stoppers cut back to Doncaster to Hull
- Sittingbourne to Sheerness cut from 2tph to 1tph
- London Victoria to Dover Priory cut from 2tph to 1tph
- Victoria to Canterbury West no longer runs
- London Charing Cross to Tunbridge Wells semi-fast services no longer run
- Cannon Street circular via Greenwich and Bexley services only running Cannon Street – Bexley – Dartford
- Charing Cross to Dartford (first stop after London Bridge Woolwich Arsenal) services no longer run
- Charing Cross to Dartford via Bexleyheath cut from 2tph to 1tph
- Bromley North shuttle cut from 3tph to 2tph
- Victoria to Bromley South stoppers no longer run
- Southern Victoria to Brighton services no longer run (diverted to Eastbourne)
- Brighton to Lewes terminators cut
- Brighton to Hove shuttles cut
- Victoria to East Grinstead cut from 2tph to 1tph
- Milton Keynes Central to East Croydon not running north of Watford Junction
- Victoria to Sutton terminators no longer running
- Victoria to Dorking cut from 2tph to 1tph with Horsham services staying
- London Bridge to East Croydon local service cut from 4tph to 2tph
- Kentish Town to Orpington services no longer running
- TransPennine Express Newcastle to Edinburgh cut from hourly to 5tpd (but 1tp2h from December and with more intermediate stops than just Morpeth)
- Manchester Airport to Newcastle no longer runs
- Newcastle to Reading / Southampton Central cut from 1tph / 1tp2h to 5tpd to Reading
- Birmingham New Street to Stansted cut from 1tph to 1tp2h south of Cambridge (restored in a few weeks)
- 2tph nonstop Glasgow Central to Kilwinning no longer run (Glasgow–Ayrshire cut from 6tph to 4tph)
- Glasgow Queen Street to Anniesland cut from 2tph to 1tph
- Waterloo to Guildford via Epsom cut from 2tph to 1tph
- Waterloo to Dorking cut from 2tph to 1tph
- Waterloo to Waterloo via Hounslow services no longer run
- Edinburgh to Glasgow Queen Street via Falkirk High cut from 4tph to 2tph
- Edinburgh to Helensburgh Central cut from 4tph to 2tph
- Edinburgh to Glasgow Queen Street via Cumbernauld cut from 2tph to 1tph Falkirk Grahamston to Glasgow
- Wrexham General to Bidston 1tph to 4tp3h
- Cardiff Central to Swansea local service 1tp2h to 1tph
- Ebbw Vale Town gaining an hourly Newport service
- Corby going from hourly to Kettering and (some?) through services to 2tph to St. Pancras
- Peterborough to Spalding services extended to make Peterborough to Lincoln mostly hourly
- Carmarthen (and Weston-super-Mare? I don't think it was as frequent pre-Covid) gaining a London Paddington service every two hours
- I think Swindon to Cheltenham Spa was a shuttle in alternate hours rather than an hourly Paddington service
- Bristol Temple Meads to Salisbury increasing to 3tph (partly replacing irregular SWR Bristol services)
- Gloucester to Bristol increased from 1tph to 2tph
- Worcester to Bristol increased from 1tp2h to 1tph
- Okehampton properly opening
- Lumo started
- Northumberland line opening with 2tph
- Extra 1tp2h semi-fast between Newcastle and Middlesbrough
- Manchester Piccadilly to York via Wakefield Kirkgate services starting
- Strood to Paddock Wood increased from 1tph to 2tph but with no Tonbridge services
- Liverpool Street to Shenfield increased from 6tph to 8tph via Whitechapel; Crossrail opening
- 2tph Reading to Gatwick rather than 1tph Reading to Gatwick and 1tph Reading to Redhill
- Levenmouth services started
Last edited: