Sorry, I should’ve been clearer.
I was referring to the work being undertaken around the bridge beside Sheffield Ring Road near the junction with Savile Street.
Specific Location
****Update****
I went to take a closer look at the work being done this morning - it’s really quite extensive.
The line is now very visible, for those that don’t know the area it used to be covered in undergrowth and at points it was barely possible to see the line at all.
And the bridge work is long term - not scheduled to be completed until next month.
I’ve attached some photos for those that are interested.
All seems rather excessive if the line is at risk of closure, no?