A 6Z09 ran from Aldwarke to Tinsley last Friday evening, STP schedule here:
Could it have been some Stocksbridge wagons going for storage?
 

Lemmy282

Member
Joined
8 Apr 2021
Messages
131
Location
Sheffield
Apparently not. It is an occasional train of stainless from Tinsley to Aldwarke and back, runs every few months. It went over with 6 loaded BVA's on Thursday and returned empty on Friday, loco then went off to Doncaster.
Usual wagons for Deepcar are BBA's, and I'm told they are all stopped at the moment due to cracks.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
2,926
Location
S Yorks, usually
Apparently not. It is an occasional train of stainless from Tinsley to Aldwarke and back, runs every few months. It went over with 6 loaded BVA's on Thursday and returned empty on Friday, loco then went off to Doncaster.
Usual wagons for Deepcar are BBA's, and I'm told they are all stopped at the moment due to cracks.
Bang goes that theory! Never knew about that stainless working though. Thanks.
 

Steelman79

Member
Joined
31 Jan 2016
Messages
17
It's been reported on local Facebook pages that there was a track gang and vehicles on the branch all last week, replacing sleepers etc.
 

Lemmy282

Member
Joined
8 Apr 2021
Messages
131
Location
Sheffield
Interesting. I was down in town today, and there has been extensive clearing of vegetation on the line near the Wicker arches, and the bridge over Brunswick Road is all sheeted over, I assume they are attending to the structure. Obviously they are doing quite a lot of work on the line, can't imagine it is just because a railtour is due to go up there.
Reminds me of many years ago, they repainted Rotherham South Junction signal box and three weeks later demolished it!
Let's hope this is different.

Nigel L
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
15,288
Location
Bristol
Interesting. I was down in town today, and there has been extensive clearing of vegetation on the line near the Wicker arches, and the bridge over Brunswick Road is all sheeted over, I assume they are attending to the structure. Obviously they are doing quite a lot of work on the line, can't imagine it is just because a railtour is due to go up there.
Reminds me of many years ago, they repainted Rotherham South Junction signal box and three weeks later demolished it!
Let's hope this is different.

Nigel L
Vegetation could well be purely for a charter, NR have been billed for scratching the paintwork before! Depending on the condition of the line, it's possible that it is only for a railtour, as they need to make the line safe for the passenger train, but I'd guess Bridge works is for something larger as usually they'd just ask for a very low speed over the structure. Sleepers would also be a lot of work for 1 railtour, especially as when it's on the branch it's not getting in the way of anything else.
 

Intercity 225

Member
Joined
2 Mar 2014
Messages
329
I’m local to the area and walk past the work that’s being carried out regularly - it’s still going on and has been for months now.

Seems quite extensive and has now required long term closure of a significant pedestrian walkway/cycle route.

Does anyone have any update as to what is going on? Surely all this work can’t just be to accommodate a railtour.
 

Lemmy282

Member
Joined
8 Apr 2021
Messages
131
Location
Sheffield
Well on Traksy this morning the word TREE appears in the Deepcar berth, so I assume some work is going on. I know last year a steel train went up the branch and hit several branches, some ending up stuck in the side grilles. One of the crew described Deepcar as "Deepcar forest"
 

Intercity 225

Member
Joined
2 Mar 2014
Messages
329
Sorry, I should’ve been clearer.

I was referring to the work being undertaken around the bridge beside Sheffield Ring Road near the junction with Savile Street.

Specific Location


****Update****

I went to take a closer look at the work being done this morning - it’s really quite extensive.

The line is now very visible, for those that don’t know the area it used to be covered in undergrowth and at points it was barely possible to see the line at all.

And the bridge work is long term - not scheduled to be completed until next month.

I’ve attached some photos for those that are interested.

All seems rather excessive if the line is at risk of closure, no?
 

Attachments

  • 3014F04D-59AF-48A1-9F2E-3A071B0052A2.jpeg
    3014F04D-59AF-48A1-9F2E-3A071B0052A2.jpeg
    3.5 MB · Views: 88
  • A6948C56-F305-4D8F-B3C8-5DBE17630552.jpeg
    A6948C56-F305-4D8F-B3C8-5DBE17630552.jpeg
    2.3 MB · Views: 86
  • 2259E88E-C5DD-4087-BF0D-C970F1CF6390.jpeg
    2259E88E-C5DD-4087-BF0D-C970F1CF6390.jpeg
    3.1 MB · Views: 84
  • 0119F2F5-329F-4E57-B20D-76E9ED7C882E.jpeg
    0119F2F5-329F-4E57-B20D-76E9ED7C882E.jpeg
    3.1 MB · Views: 81
  • 8173E0C5-7300-41C4-AC31-B46185E68968.jpeg
    8173E0C5-7300-41C4-AC31-B46185E68968.jpeg
    4.3 MB · Views: 80
  • E78BFC4A-1B46-4285-B8E3-41EF4E600949.jpeg
    E78BFC4A-1B46-4285-B8E3-41EF4E600949.jpeg
    3.8 MB · Views: 74
  • 6F3868EF-8EA2-4B30-8281-30A18212AD33.jpeg
    6F3868EF-8EA2-4B30-8281-30A18212AD33.jpeg
    3.8 MB · Views: 72
  • B1A9FF27-8AF0-4A28-B0C6-75554C20A440.jpeg
    B1A9FF27-8AF0-4A28-B0C6-75554C20A440.jpeg
    4.8 MB · Views: 83
Last edited:

Iskra

Established Member
Joined
11 Jun 2014
Messages
9,145
Location
West Riding
Interesting, thanks for sharing.

Supertram have confirmed to me that they have no plans of taking over the line.

Perhaps there’s a possibility that freight use may rise again should activity at the Stocksbridge plant increase again.
 

BR 45111

Member
Joined
28 Aug 2019
Messages
163
Location
Sheffield
Sorry, I should’ve been clearer.

I was referring to the work being undertaken around the bridge beside Sheffield Ring Road near the junction with Savile Street.

Specific Location


****Update****

I went to take a closer look at the work being done this morning - it’s really quite extensive.

The line is now very visible, for those that don’t know the area it used to be covered in undergrowth and at points it was barely possible to see the line at all.

And the bridge work is long term - not scheduled to be completed until next month.

I’ve attached some photos for those that are interested.

All seems rather excessive if the line is at risk of closure, no?
It could be possibly be no more than someone using their end of year budget up and for no long term purpose other than making things look more presentable .

I’ve covered 6J57 for over 10yrs with photographs of 20’s at Deepcar from the 90’s , although there have been up and downs in the volume of traffic I cannot recall a gloomier outlook than the present.

Regards
Marcus

 

Lemmy282

Member
Joined
8 Apr 2021
Messages
131
Location
Sheffield
50008 Thunderer has just run up to Deepcar from Worksop.

Originally this was a run from Belmont in Doncaster to Worksop via Maltby and back a couple of times for route familiarisation in connection with some future engineering works. I went to photo it at Shireoaks, and then discovered one of the runs had changed and it was going up to Deepcar, so I went to Brunswick Road to photo it passing the old Victoria station.
As it approached the station it stopped and half a dozen orange jackets got out, wandered around the area for a few minutes, then got back in before it set off for Deepcar!
 
Last edited:

fishwomp

Member
Joined
5 Jan 2020
Messages
912
Location
milton keynes
50008 Thunderer has just run up to Deepcar from Worksop.

Originally this was a run from Belmont in Doncaster to Worksop via Maltby and back a couple of times for route familiarisation in connection with some future engineering works. I went to photo it at Shireoaks, and then discovered one of the runs had changed and it was going up to Deepcar, so I went to Brunswick Road to photo it passing the old Victoria station.
As it approached the station it stopped and half a dozen orange jackets got out, wandered around the area for a few minutes, then got back in before it set off for Deepcar!
Any chance it could be connected to the railtour on April 8th?

Surely wouldn't be doing route learning for the track demolition train.. it would be a fantastic sign if they are expecting the business to return though..
 

Lemmy282

Member
Joined
8 Apr 2021
Messages
131
Location
Sheffield
No idea why it was changed st the last minute. Could be in connection with the railtour. Is this the first time a 50 has been to Deepcar?

Will post a picture when I can get them off the camera.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
9,145
Location
West Riding
No idea why it was changed st the last minute. Could be in connection with the railtour. Is this the first time a 50 has been to Deepcar?

Will post a picture when I can get them off the camera.
I don’t think it’s the first time, as there are pictures of one going over Woodhead so it will have passed through a very different looking Deepcar.

Looking forward to seeing your picture, certainly a great and very unusual catch.
 

BR 45111

Member
Joined
28 Aug 2019
Messages
163
Location
Sheffield
Pictures as promised. Still not got a definitive reason why there was a change of plan though.

View attachment 131427View attachment 131428View attachment 131429
Class 1 Donny driver testing out the gauge for the railtour in April and some route refresh.

Regards
Marcus

Class 1 Donny driver testing out the gauge for the railtour in April and some route refresh.

Regards
Marcus
From the horses mouth via a good friend who’s a DB driver at Knottingley . The loco is working over the SYJ from Tuesday till Friday this week Donny - Worksop in connection with some up and coming ballast work .

Regards
Marcus
 

Lemmy282

Member
Joined
8 Apr 2021
Messages
131
Location
Sheffield
You beat me to it, got the same info this morning.
To answer my own question, this is not the first time a 50 has run on this line. A Footex from Manchester area ran to Wadsley Bridge on 14 March 1970, 1Z12 with D414, only known record of the class on this route.
 

GardenRail

Member
Joined
26 Mar 2023
Messages
504
Any chance it could be connected to the railtour on April 8th?

Surely wouldn't be doing route learning for the track demolition train.. it would be a fantastic sign if they are expecting the business to return though..
It was route learning for the charter, nothing more.
 

BR 45111

Member
Joined
28 Aug 2019
Messages
163
Location
Sheffield
The railtour won’t be the last thing up the branch , there may even be something before but the 2Z02 York - York which I believe is Caroline is paying a visit on the 3rd May .

Regards
Marcus
 

GardenRail

Member
Joined
26 Mar 2023
Messages
504
The railtour won’t be the last thing up the branch , there may even be something before but the 2Z02 York - York which I believe is Caroline is paying a visit on the 3rd May .

Regards
Marcus
Nothing that actually justifies the lines existence then. Steel. Network Rail won't keep it maintained on a hobby basis. It will fall into disrepair.
 

geoffk

Established Member
Joined
4 Aug 2010
Messages
3,638
What happened to the "restoring your railway" bid for this line? You'd like to think that lessons from the past would be learnt and the right of way retained.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
15,288
Location
Bristol
Nothing that actually justifies the lines existence then. Steel. Network Rail won't keep it maintained on a hobby basis. It will fall into disrepair.
Network rail can't just abandon it though, it has to go through a consultation process with TOCs and FOCs and if they agree then it goes public. I think it's quite a high chance that FOCs will push as hard as possible for retention.
What happened to the "restoring your railway" bid for this line? You'd like to think that lessons from the past would be learnt and the right of way retained.
It didn't get through, because there wasn't any case for funding. The Right of way can be retained by a cycleway if they want.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
15,288
Location
Bristol
Have you got a source for that bit please?

Stocksbridge appears in the list of received bids, but not in the list of unsuccessful bids. As all bids were assessed on the business case, it can reasonably be inferred that there was not sufficient case. For context, the restoration of services to Kilimarsh and Barrow Hill did receive funding and the timetable implications were looked at.

Regarding the cycleway, there's not really a source for that as it's not really a policy/legal thing but more a 'physically not building anything that can't be easily torn up' thing. A Cycle way has been used in the UK and abroad to maintain rail alignments for strategic use (Cuckoo trail, Forest way in Sussex, for instance)
 
Status