Impressive stuff. Hopefully they can actually get into service soonSpotted the new trains on test at Elverson Road and Lewisham today.
Quite so. It seems there's hardly a weekend in May when it is possible to go right through on the line from Tower Gateway to Beckton, for example. Rather like some stretches of the Overground, it seems the engineering requirements have got comfortable with disrupting everything for their own convenience. Bear in mind the old contracts with DLR operators used to specify each branch to be closed not more than one weekend per year.The constant closures every single weekend are getting silly now. The network isn't reliable at all outside of a weekday. Must be costing TfL a ton in lost fare revenue.
That's what they were doing more than 2 years ago. Look back in this thread to April 2023, with the same weekend closures and the same two trains; they don't seem to have any more delivered.I would assume these closures are so they can get the new rolling stock certified and into revenue earning service ASAP.
That's what they were doing more than 2 years ago. Look back in this thread to April 2023, with the same weekend closures and the same two trains; they don't seem to have any more delivered.
Um ... they were ordered in June 2019. It's ALREADY been 6 years !I'm not sure if the B23s rollout is going to take 6 years, that's just being hyperbolic.
The original promised date of introduction is what's being referred to, not when they were ordered.Um ... they were ordered in June 2019. It's ALREADY been 6 years !
Keeping in mind that the pandemic happened which delayed things.The original promised date of introduction is what's being referred to, not when they were ordered.
It's only May so I would say there is a chance, I would imagine it'll be like the Elizabeth Line where the rollout is announced only a short time before it begins.In reality, is there any chance of them being in service before the end of this year?
The Lewisham branch has just been closed for two consecutive weekends, including the bank holiday, and in the coming weeks it will be closed for three weekends out of five. It really is making life very difficult and inconvenient.Quite so. It seems there's hardly a weekend in May when it is possible to go right through on the line from Tower Gateway to Beckton, for example. Rather like some stretches of the Overground, it seems the engineering requirements have got comfortable with disrupting everything for their own convenience. Bear in mind the old contracts with DLR operators used to specify each branch to be closed not more than one weekend per year.
One can only hope. This has been dragging out a little bitKeeping in mind that the pandemic happened which delayed things.
It's only May so I would say there is a chance, I would imagine it'll be like the Elizabeth Line where the rollout is announced only a short time before it begins.