Does anyone know what engineering work is going on, on the EMT line in May?
I've booked to go to Paris on Eurostar and I've had to go from Chesterfield to London via Doncaster on the East Coast line as there's engineering work on Sat 23rd May.
On the way back on 30 May they've told me no advance fares are available as Network Rail are scheduling further engineering works. Their search facility doesn't bring anything up.
** Incidentally - Euston to Tamworth is £3!!!!! What a fare!