Bletchley Viaduct: work continues at various points. The top surface of the Box and the viaduct now shows white (concrete) on aerial photos rather than dark (forest of rebar loops on top of beams). The triangular section joining the Box to the northern viaduct is becoming more complete, most of the heavy-looking parapet blocks are now in place on new sections of viaduct to north and south, and steelwork is going up at the site of the new high-level station. While hard to see at ground level, it looks like the trackbed diagonally across the Box will be confined by high concrete sides.
Pictures taken Saturday 25th (1025, 1026,1030)
Pictures 1031,1032 taken Thurs 30th.