• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Eritrea 2018 - 15: Mallet Double Header Finale (50 p.)

Status
Not open for further replies.

Roni

Member
Joined
19 Mar 2007
Messages
611
Location
Vienna, Austria
Hi,



To the previous part of the series:
Eritrea 2018 - 14: Final Steam Morning (50 p.)
http://www.railroadforums.com/forum/index.php?threads/eritrea-2018-14-final-steam-morning-50-p.14173


Video for this series:



Map of the mountain section:
https://en.wikipedia.org/wiki/Eritrean_Railway#/media/File:Eritrean_Railway_Map_of_March,_1998.svg




October 27 2018

Our double header consisting of Mallets 440.008 and 442.56 steamed out of tunnel 23 Saturday afternoon.
eri1501.jpg




The group subsequently changed to the other valley side.
eri1502.jpg





eri1503.jpg




Out of tunnel 24, the train negotiated the curve I already had captured in the evening mist on the first full photo day. Of course once more with the nicest kids in the area.
eri1504.jpg




We continued to the entrance of long tunnel 27.
eri1505.jpg





eri1506.jpg




I left a bag full of stationery here, so someone lucky may find it.
eri1507.jpg




Next, a highlight of the trip: several double header run-pasts through Devil's Gate.
eri1508.jpg





eri1509.jpg





eri1510.jpg




Yellow canisters everywhere.
eri1511.jpg





eri1512.jpg




These "hats" are traditional covers for storage vessels.
eri1513.jpg




An ant trail led straight across the terrace in front of the house. The two Mallets thundered past again soon, things went more smoothly with twice (or rather four times) the power.
eri1514.jpg





eri1515.jpg





eri1516.jpg




Rolling back did not look bad as well.
eri1517.jpg





eri1518.jpg





eri1519.jpg




Perfect spotlight.
eri1520.jpg




A double Mallet panoramic view of Devil's Gate as good-bye.
eri1521.jpg




Next stop: 4-arch viaduct. News spread at a running pace.
eri1522.jpg




The first run-past.
eri1523.jpg




A bit further downhill for the second one.
eri1524.jpg




That way a dynamic panorama of the silhouette could be captured.
eri1525.jpg




Inside the passenger carriage with the train manager before the group boarded. The image is real, only a double exposure for the view outside to the left.
eri1526.jpg




The children living in the mountainside villages turned out to be "vertically mobile". The winner of my bag - perhaps he already has opened his own unofficial stationery shop in the meantime.
eri1527.jpg




Notice the F.S. inscription.
eri1528.jpg




We got off at the horseshoe curve where we had encountered the wedding party on the first afternoon of the trip. This time I climbed up the hill.
eri1529.jpg




It paid off...
eri1530.jpg




In the background to the right: the bridge on the lowest level towards Arbaroba where we had taken photos Friday morning.
eri1531.jpg




The whole curve.
eri1532.jpg




More mist came in.
eri1533.jpg




Leading to this gigantic spotlight mood.
eri1534.jpg





eri1535.jpg




It was time to climb down again.
eri1536.jpg




Next spot: mountain range viewpoint.
eri1537.jpg




Through the forest, already with longer time exposure,...
eri1538.jpg




... as I had planned a series of panning shots.
eri1539.jpg





eri1540.jpg




Last stop at the kilometre 115 loop above Asmara.
eri1541.jpg




Time for a shadow-selfie as the train rolled back.
eri1542.jpg




Final run-past below the antennas.
eri1543.jpg





eri1544.jpg




Downhill past the pond.
eri1545.jpg




Through the station yard gate.
eri1546.jpg




Where the local/global junior football team was waiting.
eri1547.jpg




Sunset with campanile.
eri1548.jpg




Arrival of the train.
eri1549.jpg




Next time, we say good-bye and start the journey home.
eri1550.jpg
 
Status
Not open for further replies.

Top