greatkingrat
Established Member
- Joined
- 20 Jan 2011
- Messages
- 2,768
The platforms at Finsbury Park have been renumbered over the weekend. All existing platforms have increased in number by 2, and presumably 1 & 2 will be used for the disused island platform that is currently being brought back into service. The new layout will be
Up Slow 2
Platform 1/2 (under construction)
Up Slow (will trains open doors on P2 or P3 once the new island opens?)
Platform 3/4
Up Fast
Down Fast
Platform 5/6
Down Slow (doors only open on P7)
Platform 7/8
Down Moorgate
I have read posts about how renumbering stations is very complicated because of links to signalling systems etc, but this seems to have happened virtually overnight.
Up Slow 2
Platform 1/2 (under construction)
Up Slow (will trains open doors on P2 or P3 once the new island opens?)
Platform 3/4
Up Fast
Down Fast
Platform 5/6
Down Slow (doors only open on P7)
Platform 7/8
Down Moorgate
I have read posts about how renumbering stations is very complicated because of links to signalling systems etc, but this seems to have happened virtually overnight.