VisualAcid
Member
- Joined
- 17 Oct 2013
- Messages
- 142
I want to use a return portion of a Super off-peak return from Bristol to Flitwick just after Christmas. The GWR journey planner is offering no valid journeys on the 27th from Flitwick to Bristol between 10:30 and 16:30, as the suggested trains are via Leicester and Birmingham.
This latter journey is allowed using a super off-peak single. Is this an engineering timetable problem that will be sorted out does anyone know? GWR on Twitter have been useless.
This latter journey is allowed using a super off-peak single. Is this an engineering timetable problem that will be sorted out does anyone know? GWR on Twitter have been useless.