• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GB Pompey Engineering

Status
Not open for further replies.

Julian G

Established Member
Joined
9 Jun 2005
Messages
3,545
Work between Petersfield and Haslemere

Sat 09/09

6G14 1020 Eastleigh-Havant (1107), Fareham 1047

6G10 1200 Petersfield-Eastleigh (1425), Woking 1236-1306, Basing 1344

6G11 1400 Pfield-Eastleigh (1625), same route, two hours after G10

6G12 1500 Pfield-Eastleigh (1725), three hours after G10

6G13 1800 Pfield-Eastleigh (2025), six hours after G10

Sun 10/09

6G15 1130 Haslemere-Eastleigh (1355), Woking 1206-1236, Basing 1314

Sorry for late posting.

KH 09/09
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Julian G

Established Member
Joined
9 Jun 2005
Messages
3,545
Should have added 73204 + 73205 are on 6G13. Looks like the rest will be 66/7s.

Ta ME

KH
 
Status
Not open for further replies.

Top